Install the Shelf and Backplane Cable
This chapter provides procedures for installing the Cisco ONS 15454. For a summary of the tools and
equipment required for installation, see the
Before You Begin
This section lists the chapter procedures (NTPs). Turn to a procedure for applicable tasks (DLPs).
1.
2.
3.
4.
5.
6.
7.
8.
9.
10.
11.
12.
78-18537-01
before continuing with the
assembly in a rack.
equipment before continuing with other procedures.
backplane before continuing with other procedures.
This procedure is a prerequisite to the
1-22.
the
"NTP-A7 Install the Fan-Tray Assembly" procedure on page
assembly in the shelf.
planning to install the Alarm Interface Controller-International (AIC-I) card and want to increase
the number of alarm contacts provided by the AIC-I card.
this procedure as needed to set up wire-wrap pin connections.
connect an external wire-wrap panel to the alarm expansion panel (AEP).
NTP-A9 Install the Electrical Card Cables on the Backplane, page
if you plan to install electrical card cables.
NTP-A10 Route Electrical Cables, page
electrical cables installed on the backplane.
C H A P T E R
"Required Tools and Equipment" section on page
"NTP-A2 Install the Shelf Assembly" procedure on page
1-5-Complete this procedure to install the shelf
1-6-Complete this procedure to access the
1-7-Complete this procedure to access the
1-8-Complete this procedure if you plan to install electrical cards.
"NTP-A9 Install the Electrical Card Cables on the Backplane"
1-9-Complete this procedure before continuing with
1-11-Complete this procedure to install the fan-tray
1-13-Complete this procedure if you are
1-23-Complete this procedure as needed to route
Cisco ONS 15454 Procedure Guide, Release 8.5.1
1
1-2.
1-4-Complete this procedure
1-5.
1-11.
1-16-Complete
1-17-Complete this procedure to
1-22-Complete this procedure
1-1