Doc. No.
78-1897-01
Cisco 7513 Chassis Replacement Instructions
Product Numbers: CHAS-7513-DC=, CHAS-7513-AC=, and MAS-7513=
This document provides instructions for replacing the Cisco 7513 chassis, which is available as a
spare part.
Note
The chassis is available as a spare part, and includes all of the components required for operation
except the processor modules and power supplies (MAS-7513=), or as a spare with power supplies
(CHAS-7513-DC= or CHAS-7513-AC=).
After you replace the chassis, you must move the processor modules from your old chassis into your
new chassis.
The replacement chassis does not include the cable-management or rack-mounting hardware kits.
You can move the rack-mounting hardware and cable-management bracket from the existing chassis,
or order either kit as a spare part, which will ship with installation instructions.
The sections in this document include the following:
•
•
•
•
Copyright © 1995
Cisco Systems, Inc.
All rights reserved.
Through this document, the term the chassis is be used to refer to the Cisco 7513 chassis.
What Is the Cisco 7513?, page 2
Prerequisites, page 3
Replacing the Chassis, page 7
— Replacing a Rack-Mounted Chassis, page 8
— Installing the Cable-Management Bracket, page 12
— Moving Processor Modules from the Old Chassis to the New Chassis, page 13
— Checking the Installation, page 17
— Verifying the Installation Using show Command Descriptions and Examples, page 19
Cisco Information Online, page 22
1