Page 7
Proper service and repair is extremely important for the safe operation of your machine. The service and repair techniques recommended by Komatsu Utility and describe in this manual are both effective and safe methods of operation. Some of these operations require the use of tools specially designed by Komatsu Utility for the purpose.
Page 8
22. When aligning two holes, never insert your fingers or hand. 23. When measuring hydraulic pressure, check that the measuring tool is correctly assembled before taking any measurement. 00-4 PC20R-8 PC27R-8...
Page 9
This section gives the judgement standards when inspecting disassembled parts. NOTICE The specifications contained in this shop manual are subject to change at any time and without any notice. Contact your Komatsu Utility distributor for the latest information. 00-5 PC20R-8 PC27R-8...
Page 10
DISTRIBUTION AND UPDATING Special safety precautions are ne- Any additions, amendments or other changes will cessary when performing be sent to Komatsu Utility distributors. work. Get the most up-to-date information before you start any work. Safety Extra special safety precautions...
Page 11
2) Sling wire ropes from the middle portion of the hook. Slinging near the edge of the hook may cause the rope to slip off the hook during hoist- 00-7 PC20R-8 PC27R-8...
Page 12
320w35 3150w350 Ð 295w33 2900w330 410w45 4050w450 This torque table does not apply to bolts or nuts which have to fasten nylon or other parts non-ferrous metal washer. . Nm (Newton meter): 1 Nm = 0.102 kgm 00-8 PC20R-8 PC27R-8...
Page 13
- 12 20w5 78.5w19.6 20w5 196.2w49 COATING MATERIALS The recommended coating materials prescribed in Komatsu Utility Shop Manuals are listed below: Nomenclature Code Applications Loctite 222 Used for low resistance locking of screws, check nuts and adjustment nuts. To prevent the loosening of bolts, nuts and plugs and the leakage of oil. Used for...
Page 14
Green ± Black ± ± ± COMPOSITION OF THE COLOURS The coloration of two-colour wires is indicated by the composition of the symbols listed. Example: G-V = Yellow-Green with longitudinal colouring. G/V = Yellow-Green with transversal colouring. 00-10 PC20R-8 PC27R-8...
Page 15
Track roller Idler assy. Final drive Sprocket Swing circle Shoe Steel shoe L= 300 mm Rubber shoe Swing bracket Boom Standard Long arm Bucket (standard) Blade Boom cylinder Arm cylinder Bucket cylinder Boom swing cylinder Blade cylinder 00-11 PC20R-8 PC27R-8...
Page 16
TABLE OF OIL AND COOLANT QUANTITIES < CAPACITY ( AMBIENT TEMPERATURE KIND OF RESERVOIR Specified Refill FLUID ±20 ±10 30ëC PC20R-8 PC27R-8 PC20R-8 PC27R-8 SAE 10W SAE 20W-20 Crankcase sump API CD SAE 30 SAE 40 SAE10W Hydraulic circuit API CD Final drive SAE 10W...
SWING CIRCLE PC20R-8 Sezione A - A Section A - A Section B - B Sezione B - B RKP01350 1. Outer race 2. Upper seal 3. Ball bearing 4. Inner race 5. Lower seal 10-4 PC20R-8 PC27R-8...
Page 23
PC27R-8 Section A - A Sezione A - A Sezione B - B Section B - B RKP01360 1. Outer race 2. Upper seal 3. Ball bearing 4. Inner race 5. Lower seal 10-5 PC20R-8 PC27R-8...
Ø 2.0 Hydraulic pump ST1 solenoid valve Accumulator v = 0.35 Ø 1.0 R.H. PPC valve L.H. PPC valve Swing Bucket Boom Close Close Open Left Right Open Raise Lower 100 mesh 100 mesh RKP04401 10-17 PC20R-8 PC27R-8...
Page 36
PAGE INTENTIONALLY LEFT BLANK 10-18 PC20R-8 PC27R-8...
Page 37
Cylinder block PPC valve work equipment ST1 solenoid valve Accumulator v = 0.35 R.H. PPC valve L.H. PPC valve Bucket Boom Swing Open Close Raise Lower Close Open Left Right Hydraulic pump 100 mesh 100 mesh RKP04441 10-19 PC20R-8 PC27R-8...
Page 38
Port - From control valve (LS port) Displacement: 22 cc+2.75 cc d - S1 Port - From hydraulic tank Set pressure: - Main pump: 206 bar (210 kg/cm - Gear pump: 29 bar (30 kg/cm 1. Main pump 2. Gear pump 10-20 PC20R-8 PC27R-8...
Page 40
(7), the angle of swash plate (4) is made smaller by total piston force F1 x a and is held at the position where the discharge pressure is balanced with the force of the spring. RKP00082 10-22 PC20R-8 PC27R-8...
Page 41
. Constant horsepower control is carried out with priority over load response control, so the dis- charge amount changes in the range below the flow at constant horsepower control. RKP00111 10-23 PC20R-8 PC27R-8...
- PS Port - From hydraulic tank 2. Main pump b - P2 Port - To control valve (P2 port) c - P1 Port - To control valve (P port) d - P Port - To control valve (LS port) 10-24 PC20R-8 PC27R-8...
Page 43
. The main pump is an integrated unit consisting of the pump, servo piston, TCC valve and LS valve. The explanation of the structure and function is di- vided into separate sections: 1. Main pump 2. TCC valve 3. LS valve 10-25 PC20R-8 PC27R-8...
Page 44
Sezione B - B 1. Shaft 2. Oil seal 3. Case 4. Swash plate 5. Shoe 6. Piston 7. Cylinder block 8. Valve plate 9. Spring Section C - C Sezione C - C 10. Servo piston RKP01150 10-26 PC20R-8 PC27R-8...
Page 45
(7) is sucked in and discharged through valve Rocker cam (4) forms a static bearing sending high plate (8). pressure oil at cylindrical surface B with to the case, and carries out a sliding movement. 10-27 PC20R-8 PC27R-8...
Page 46
(In actual fact, the swash plate angle never be- comes 0). RKP01260 4 - In other words, discharge amount of the pump is directly proportional to the swash plate an- 10-28 PC20R-8 PC27R-8...
Page 47
(lower), output pressure P of the LS valve is introduced. Movement of the servo piston is controlled by the relationship between pressures P and the proportion of the pressure receiving areas of the smaller and larger pistons. 10-29 PC20R-8 PC27R-8...
Page 48
- GH Port - Gear pump pressure inlet port 2. Spacer c - P Port - From control valve (LS port) 3. Piston 4. Servo piston LS VALVE 5. Piston 6. Piston 7. Sleeve 8. Spring 9. Union 10-30 PC20R-8 PC27R-8...
Page 49
(GH and GL) are brought to the LS valve. (kg /cm The relationship between pump discharge amount Differential pressure RKP01321 Q and LS differential pressure DP changes as shown in the diagram on the right. 10-31 PC20R-8 PC27R-8...
Page 50
HOLD position, no pressure oil flows to (4) moves to the right ( ) in the direction of the the control valve outlet port, so LS pressure P minimum swash plate angle. is 0 bar (0 kg/cm 10-32 PC20R-8 PC27R-8...
Page 51
. As the result, the pressurized oil acting on chamber X at the large diameter end of servo piston (4) flows from port d to port e and is connected to port f of the TCC valve. 10-33 PC20R-8 PC27R-8...
Page 52
), so servo piston (4) is moved to the right tion. ) in the direction of the minimum swash plate angle. In other words, the LS set differential pressure of 10-34 PC20R-8 PC27R-8...
Page 53
(even when the lever is operated to the same halfway position), so the discharge flow is reduced below the level when the engine is run- ning at full throttle. 10-35 PC20R-8 PC27R-8...
Page 54
This makes the force acting on both ends of servo piston (4) 1 : 1, so servo piston (4) stops in that po- sition and the pump discharge amount is balanced with the oil flow demanded by the control valve. 10-36 PC20R-8 PC27R-8...
Page 55
As a result, the LS valve is actuated and the pump discharge amount is increased, but when the pump swash plate angle rises to 3/4 the LS differential pressure DP rises to 16 bar (16 kg /cm ), so it is balanced in this position. 10-37 PC20R-8 PC27R-8...
Page 56
P goes down, pump discharge amount Q is increased. Pump discharge pressure P . The relationship between pump discharge pressure RKP01181 and pump discharge amount Q is as shown in the diagram on the right. 10-38 PC20R-8 PC27R-8...
Page 57
. The position where servo piston (4) stops is higher d, enters chamber X at the large diameter end of (closer to the minimum swash plate angle) than servo piston (4), and stops the movement of servo when the pump discharge pressure is low. piston (4). 10-39 PC20R-8 PC27R-8...
Page 58
LS valve. . For this reason, servo piston (4) is moved to the left ) in the direction of the maximum swash plate angle by the pressure in chamber Y at the small diameter end. 10-40 PC20R-8 PC27R-8...
Page 59
. The pump absorption torque curve, which shows the relationship between pump discharge pressure and discharge amount Q, is a bent curve as shown in the diagram on the right because spring Pump discharge pressure P (1) has different spring pitches. RKP01181 10-41 PC20R-8 PC27R-8...
Page 60
(3) are in balance. . In other words, if pump discharge pressure P creases, pump discharge amount Q is reduced; and if pump discharge pressure P goes down, pump discharge amount Q is increased. 10-42 PC20R-8 PC27R-8...
Page 61
PAGE INTENTIONALLY LEFT BLANK 10-43 PC20R-8 PC27R-8...
Page 63
Port - From L.H. PPC valve (P2 Port) hh. P Port - From L.H. PPC valve (P4 Port) ii. TS Port - To hydraulic tank ll. T Port - To hydraulic tank mm. C Port - To exchange oil cooler 10-45 PC20R-8 PC27R-8...
. The CLSS consists of a variable displacement single piston pump, control valve and actuators. . The pump body consists of the main pump, TCC valve and LS valve. Actuator Control valve TCC valve LS valve Servo piston RKP00661 10-52 PC20R-8 PC27R-8...
Page 71
M For the details of this action, refer to the descriptions of «HYDRAULIC PUMP». Actuator Control valve Pump passage Main pump LS passage Min. Max. Servo piston ∆ LS valve Differential pressure large (high) Differential pressure small (low) TCC valve Pump pressure high Pump pressure low RKP00651 10-53 PC20R-8 PC27R-8...
Page 72
In this way, the flow from the pump are distributed in proportion to the opening areas S1 and S2 of each valve. Load Load Actuator Actuator ∆ P ∆ P Pressure Pressure compensation compensation valve valve PUMP RKP00681 10-54 PC20R-8 PC27R-8...
Page 73
0.45 bar (4.5 kg/cm 7. Cooler by-pass valve Bucket (cracking pressure): 0.4 bar (4 kg/cm 8. Pilot relief valve: 29 bar (30 kg/cm Boom Blade Boom swing Reverse R.H. travel Forwards Reverse L.H. travel Forwards Left Swing motor Right RKP04481 10-55 PC20R-8 PC27R-8...
Page 74
S2+spring force of spring (2), spool (1) is moved to the right. Pump circuit P is then connected to tank circuit T through the drill hole. . In this way, pump discharge pressure P is set to 16 bar (16 kg/cm 10-56 PC20R-8 PC27R-8...
Page 75
. When the difference in pressure between pump discharge pressure P and LS pressure P reaches the load of spring (2), spool (1) moves to the right, and pump circuit P and tank circuit T are connected. 10-57 PC20R-8 PC27R-8...
Page 76
. For this reason, the difference in pressure between pump discharge pressure P and LS pressure P does not reach the load of spring (2) (19.69.8 bar (2010 kg/cm )), so spool (1) is pushed to the left by spring (2). 10-58 PC20R-8 PC27R-8...
Page 77
A and is taken to LS circuit chamber P . When this happens, LS circuit P is connected to tank circuit T from LS by-pass plug (4) (see the sec- tion on the LS by-pass plug). 10-59 PC20R-8 PC27R-8...
Page 78
. At the same time, the actuator circuit pressure passes through notch f in hammer spool (6), then goes through passage d, and acts on the left end of piston (7). Piston (7) and reducing valve (3) then move to the right. 10-60 PC20R-8 PC27R-8...
Page 79
(formed by the clearance between LS by-pass plug (1) and the valve body) through or- ifice b and flows to the tank circuit T. =Pump circuit =LS circuit T =Tank circuit A =To valves B =To pump LS valve 10-61 PC20R-8 PC27R-8...
Page 80
P and spool upstream proportion to the area of opening of notch a of each , and pressure loss is generated between P spool. and P 10-62 PC20R-8 PC27R-8...
Page 81
(=A) and oil flow to side receiving compensation is divided in a proportion more than area of opening of spool. Ratio of area S1 and S2 Valve Ratio Valve Ratio 0.98 Boom swing 0.98 Travel 1.00 Blade 0.98 Boom 0.95 Hammer 1.00 Bucket 1.00 Swing 0.95 10-63 PC20R-8 PC27R-8...
Page 82
. As a result, even if the other actuator is relieved, a cuit pressure P because of the balance of redu- pressure differential is created between P cing valve (1). , so more oil flows to actuator circuit A on this side (left side). 10-64 PC20R-8 PC27R-8...
Page 83
. In this way, the left and right travel actuator circuits are interconnected by the travel junction circuits, so if any difference occurs in the flow of oil to the left and right travel motors, the compensation is carried out to prevent any deviation in travel. 10-65 PC20R-8 PC27R-8...
Page 84
. Damper b is provided in the circuit to dampen any excessive characteristics in the opening or closing of the travel junction circuit if the spool is operated suddenly. 10-66 PC20R-8 PC27R-8...
Page 85
Gear pump RKP00641 OPERATION . The discharge pressure from the gear pump enter- ing chamber A acts on the bottom of valve (1). The gear pump discharge pressure is set to 29.5 bar (30 kg/cm 10-67 PC20R-8 PC27R-8...
Page 86
PAGE INTENTIONALLY LEFT BLANK 10-68 PC20R-8 PC27R-8...
G Port - From ST1 solenoid valve d. g Port - To travel motors (PS Port) (B Port) e. e Port - To blade cylinder (Head side) o. A Port - From control valve (B3 Port) 10-69 PC20R-8 PC27R-8...
SWING MOTOR PC20R-8 RKP00940 a. T Port - To hydraulic tank SPECIFICATION b. B Port - From control valve (A1 Port) Displacement: 195 rev. A Port - From control valve (B1 Port) 1. Safety valve 10-70 PC20R-8 PC27R-8...
Page 91
Sezione A - A RKP01510 a. DB Port - To hydraulic tank b. A Port - From control valve (A1 port) M Port - To control valve (C port) d. B Port - From control valve (B1 port) 10-73 PC20R-8 PC27R-8...
B. . If the oil under in line B falls below the maximum calibration pressure (even after intensive use), the rubber bag (1) will expand due to pressure from the nitrogen it. 10-81 PC20R-8 PC27R-8...
T Port - To ST1 solenoid valve (T port) e. T Port - To control valve (TS port) P Port - From ST1 solenoid valve (A port) P Port - From ST1 solenoid valve (A port) 10-82 PC20R-8 PC27R-8...
Page 101
Sezione C - C Section E - E Sezione E - E RKP01080 1. Spool 7. Joint 2. Adjusting spring (internal) 8. Cover 3. Return spring (external) 9. Pin 4. Plunger 10. Body 5. Disc 6. Nut 10-83 PC20R-8 PC27R-8...
Page 102
A (the same as FIG. 2 RKP01101 pressure at port P1) and the force of the control valve spool return spring are balanced. (Fig. 2) 10-84 PC20R-8 PC27R-8...
Page 103
A from port P1, and pushes the control valve spool. The oil returning from chamber B passes from port P2 through fine control hole f' and flows to drain chamber D. (Fig. 4) Control valve FIG. 4 RKP01121 10-85 PC20R-8 PC27R-8...
2. Adjusting spring (internal) P1 Port - To control valve (P port) 3. Return spring (external) d. P2 Port - To control valve (P port) 4. Plunger 5. Lever 6. Cover 7. Stopper 8. Body 9. Filter (100 mesh) 10-86 PC20R-8 PC27R-8...
Page 105
Control valve where the pressure in chamber A (the same as pressure at port P1) and the force of the control FIG. 2 RKP00981 valve spool return spring are balanced. (Fig. 2) 10-87 PC20R-8 PC27R-8...
Page 106
A from port P1, and pushes the control valve spool. The oil returning from chamber B passes from port P2 through fine control hole f' and flows to drain chamber D. (Fig. 4) Control valve FIG. 4 RKP01001 10-88 PC20R-8 PC27R-8...
Page 107
A Port - To PPC valve (P port) 2. Y1 Travel increment B Port - To swivel joint (G port) d. P Port - From control valve (P port) e. T Port - To hydraulic tank 10-89 PC20R-8 PC27R-8...
Page 108
PAGE INTENTIONALLY LEFT BLANK 10-90 PC20R-8 PC27R-8...
Page 117
Adjustment of valve clearance ...... . 26 Regulation of the PC valve (PC20R-8) ....46 Normal or standard tech .
Page 118
Engine oil Whole speed range ëC Max. 120 Max. 120 temperature Fuel injection Before top dead center (BTDC) degrees 14w1 14w1 timing Deflection when Fan-belt tension pressed with finger 10 ± 15 Ð force of approx. 6 Kg 20-2 PC20R-8 PC27R-8...
Page 120
17 ± 23 pedal Swing LH Travel control Forward Neutral 90 ± 110 lever Backward Accelerator lever Min. Ð Max. 160 ± 200 Work equipment, Max. 5 Max. 8 swing Play of control lever Travel Max. 10 Max. 15 20-4 PC20R-8 PC27R-8...
Page 122
Relieve pressure on swing motor Hydraulic oil temperature: All levers at HOLD Max. 35 Max. 35 45 ± 55ëC LS differential Engine speed: max. pressure Differential pressure= Travel rotating freely, pump delivery travel lever at half-way pressure ± LS pressure position 20-6 PC20R-8 PC27R-8...
Page 124
Max. 210 Hydraulic drift of swing (75ë) (Max. 90ë) (Degree) Load in bucket: PC20R-8: 126 kg PC27R-8: 135 kg Engine switched off Hydraulic oil temperature: 45 ± 55ëC Park the machine on a 15ë slope and posi- tion the boom at 135ë with respect to the ground surface.
Page 125
. FOR THE MACHINE PC27R-8 Standard Permissible value value 20ë Max. 24ë (52) (Max. 62.3) 1.7 ± 2.1 3.1 ± 3.9 34.0 Max. 38.0 194.7 Max. 233.7 (75ë) (Max. 90ë) 20-9 PC20R-8 PC27R-8...
Page 126
Engine speed: high idling Hydraulic oil temperature: 45 ± 55ëC Travel deviation Max. 500 Max. 550 Travel 20 metres on flat ground and mea- sure the deviation. The surface must be firm and horizontal. RKP01830 Measure dimension «X» 20-10 PC20R-8 PC27R-8...
Page 127
. FOR THE MACHINE PC27R-8 Standard Permissible value value Max. 1.0 30.0 24 ± 36 15.0 12 ± 18 33.0 29 ± 37 16.0 14 ± 18 Max. 500 Max. 550 20-11 PC20R-8 PC27R-8...
Page 128
Long arm Max. 300 Max. 350 RKP01860 Bucket: rated load: Short arm Max. 20 Max. 30 PC20R-8: 126 kg Boom cylinder PC27R-8: 135 kg (Retraction) In this position, measure ex- tension or retraction of each Max. 20 Max. 33 Long arm...
Page 130
Max. 5 Engine speed: high idling Hydraulic oil temperature: 45 ± 55ëC Max. 5 Check leakages: on the cylinder on the side opposite to the one under pressure. H Check one cylinder at a time Bucket Max. 5 20-14 PC20R-8 PC27R-8...
Page 131
. FOR THE MACHINE PC27R-8 Standard Permissible value value Max. 20 Max. 30 Max. 5 Max. 5 Max. 5 20-15 PC20R-8 PC27R-8...
Page 133
. FOR THE MACHINE PC27R-8 Standard Permissible value value 1.8 ± 2.8 1.8 ± 2.8 2.4 ± 3.6 2.4 ± 3.6 1.7 ± 2.7 1.7 ± 2.7 6.0 ± 8.0 6.0 ± 8.0 1.0 ± 1.4 1.0 ± 1.4 20-17 PC20R-8 PC27R-8...
Page 134
RKP01940 Engine speed: low idling Hydraulic oil temperature: 45 ± 55ëC Raise the blade to its max. height, then lower it. Measure the time that it takes to raise the machine after the blade touches the ground 20-18 PC20R-8 PC27R-8...
Page 135
. FOR THE MACHINE PC27R-8 Standard Permissible value value Max. 2 Max. 2 Max. 2 Max. 2 Max. 2 Max. 2 Max. 1 Max. 1 20-19 PC20R-8 PC27R-8...
Page 136
Permissible Check item Test condition Unit cation value value Theoretical flow 2.75 Motor speed 2600 Gear pump P2 Test pressure kg/cm Nominal capacity /min Hydraulic oil temperature: 45 ± 55 ëC Piston pump P1 See next page 20-20 PC20R-8 PC27R-8...
Page 137
Make delivery measurements with the engine running at a speed close to the test speed and then make a proportional calculation. Example: MEASUREMENT Engine speed: 2525 rpm Delivery: 42 /min PROPORTIONAL DELIVERY AT 2600 rpm (42x2600)/2525= 43.2 /min 20-21 PC20R-8 PC27R-8...
Page 138
Permissible Check item Test condition Unit cation value value Theoretical flow 3.44 Motor speed 2600 Gear pump P2 Test pressure kg/cm Nominal capacity /min Hydraulic oil temperature: 45 ± 55 ëC Piston pump P1 See next page 20-22 PC20R-8 PC27R-8...
Page 139
Make delivery measurements with the engine running at a speed close to the test speed and then make a proportional calculation. Example: MEASUREMENT Engine speed: 2525 rpm Delivery: 42 /min PROPORTIONAL DELIVERY AT 2600 rpm (42x2600)/2525= 43.2 /min 20-23 PC20R-8 PC27R-8...
Page 140
Scale 60 bar ATR800140 Compression gauge Scale 400 bar ATR800010 Compression gauge Scale 600 bar Hydraulic pressure Servocontrol kit ATR800200 Ð (Differential pressure) 3F3055600 Elbow P2 Pressure Included in the Track shoe tension 823001135 Grease nipple machine tool kit 20-24 PC20R-8 PC27R-8...
Low idling without load (accelerator lever in "mini- mum" position). High idling without load (accelerator lever in "maximum" position). H Low idling: PC20R-8: 950w25 rpm PC27R-8: 1050w25 rpm H High idling: PC20R-8: 2780w25 rpm PC27R-8: 2785w25 rpm H If the minimum and maximum speeds do not fall...
(8), and the O-rings (9). Thoroughly clean the contact surface on the cylinder heads. 2 - Replace the valve cover (8) and mount the O-rings (9) and the lock nuts (10). Lock nuts for cover: 25w3 Nm RKP06560 20-26 PC20R-8 PC27R-8...
C1 or C2. If the speed does not correspond with the control value, check it against the diagram. RKP06370 H Compression value: Normal: PC20R-8: 32w1 kg/cm at 250 rpm PC27R-8: 31w1 kg/cm at 250 rpm PC20R...
20 hours of operation. Crankshaft Puleggia pulley albero motore Screws fastening the alternator to the timing system cover: 45 ± 54 Nm RKP04800 Screws locking the support: 25 ± 32 Nm 20-28 PC20R-8 PC27R-8...
15° H In order to determine the degrees of intermediate 20° fuel injection timing, sub-divide the space be- 10° tween 10ë and 15ë. 15° H Normal fuel injection timing: 14w1ë 10° Notch RKPA0011 20-29 PC20R-8 PC27R-8...
Page 146
H After adjustment of the fuel injection timing: 8 - Connect the fuel delivery tubes (4) to the pump and replace the clamp (3). Delivery tube couplings: 31.85w2.45 Nm 9 - Bleed any air from the fuel circuit. 20-30 PC20R-8 PC27R-8...
4 - Push the accelerator control lever (2) to the end of its stroke in the maximum position, until the lever (4) rests against the maximum-adjustment screw (6). 5 - Tighten the screw (6) until it is 0.1 mm from the lever (2) and then tighten the lock-nut. RKPA2201 20-31 PC20R-8 PC27R-8...
Before starting the engine to check the adjust- ment, make sure that the valve block spool re- turns to its neutral position each time the lever RKPB5505 (4) is released. 8 - Re-assemble the inner cover of the control valve com- partment (1). 20-32 PC20R-8 PC27R-8...
(4). 4 - Firmly tighten the nuts (2). RKPA3200 ALIGNAMENT ERROR BETWEEN LEVER IN NEUTRAL POSITION 0 ± 3 mm TRAVEL LEVERS BOOM SWING CONTROL PEDAL RKP06630 [ A= for canopy: 200 mm for cabin 220 mm 20-33 PC20R-8 PC27R-8...
5 - Keeping the position of the lever (4), tighten the nut (2). 6 - Repeat the same operations for the other direction RKPA3280 and for the other lever. Before starting the engine, check that the levers and the valve block spools return to their neutral position. 20-34 PC20R-8 PC27R-8...
4 - Hold the pedal (5) in position and lock the nut (3). 5 - Repeat the same operations for the other working di- rection of the pedal. Before starting the engine, check that the pedal and control valve spools return to their neutral positions. RKPA3280 RKP06640 20-35 PC20R-8 PC27R-8...
4 push-rods (4). H During this adjustment, take care not to acti- vate any of the push-rods (4) individually. 4 - Secure this position by tightening the retaining nut (2) to the specific torque. Retaining nut: 113w15 Nm RKP06380 20-36 PC20R-8 PC27R-8...
4 - Tighten the microswitch (9) until it depresses the push-button by 3w0.5 mm. 5 - Put the console (6) into its 'safe' position and lock the nut (8). 6 - Connect the connectors (7) and replace the cover (1). RKPA3240 20-37 PC20R-8 PC27R-8...
4 - Force the boom downwards until the track-shoe to be checked is completely raised. 5 - Measure the distance «A» in the following posi- tions: PC20R-8: Between the 2 sprocket track roller and the track shoe. PC27R-8: Between the 3 sprocket track roller and the track shoe.
Page 156
"A" between the chassis and the sprocket wheel. To check the pressures of the swing, insert the swing lock. H Normal pressures: Working equipment and travel: 210 10 kg/cm (206 10 bar) Swing: 155 5 kg/cm (151.9 5 bar) RKPA3870 20-40 PC20R-8 PC27R-8...
Page 157
PPC valve to the end of its stroke and with the pressure stabilized. H Normal pressure: 215 5 kg/cm (211 5 bar) 6 - Restore the setting of the main relief valve. RKPA2270 20-41 PC20R-8 PC27R-8...
Page 158
To DECREASE pressure, turn in a COUN- TER-CLOCKWISE direction. 3 - Lock the nut (3) and replace the cap nut (2). H After the adjustments, check the setting of the safety valves following the same procedure used for the measurements. RKP04920 20-42 PC20R-8 PC27R-8...
Page 159
WISE direction. To DECREASE pressure, turn in a COUN- TER-CLOCKWISE direction. H Each turn of the adjusting screw (3) varies the pressure by about 100 bar (102 kg/cm 2 - Lock the nut (2). Nut: 8.8w1 Nm RKP06430 20-43 PC20R-8 PC27R-8...
CONTROL AND REGULATION OF THE LS DIFFERENTIAL TESTING AND ADJUSTMENTS PRESSURE AND ADJUSTMENT OF THE LS VALVE (PC20R-8) CONTROL AND REGULATION OF THE LS DIFFERENTIAL PRESSURE AND ADJUSTMENT OF THE LS VALVE (PC20R-8) Test 1. Test method with differential pressure gauge E3 1 - Remove the plugs (1) and (2), mount the elbow E5 and mount two pressure adapters.
Page 161
CONTROL AND REGULATION OF THE LS DIFFERENTIAL TESTING AND ADJUSTMENTS PRESSURE AND ADJUSTMENT OF THE LS VALVE (PC20R-8) LS valve adjustment If the DP value is not the one indicated, adjust the LS valve (1) as follows: 1 - Disconnect the tube (2).
TESTING AND ADJUSTMENTS REGULATION OF THE PC VALVE (PC20R-8) REGULATION OF THE PC VALVE (PC20R-8) H If the engine speed decreases when an increase in pressure or delivery is requested, or when the speed of the working equipment is low, even though the en-...
4. Make a note of the value read. 7 - Subtract the LS pressure from the delivery pres- sure of the pump (P ) in order to obtain the differ- ential pressure value DP ± LS=DP H DP normal= 34.3 bar (35 kg/cm RKPA2370 20-47 PC20R-8 PC27R-8...
Page 164
RKPA2400 pressure by about 13 bar (13 kg/cm 3 - Lock the nut (3). Nut: 31w3.5 Nm H After the adjustment, check the setting of the LS valve (1) following the procedure used for the test. RKP06510 20-48 PC20R-8 PC27R-8...
If the engine rpm suffer an abnormal drop, turn RKPA2410 the screw (3) in a COUNTER-CLOCKWISE direc- tion to DECREASE the torque absorption. 3 - After adjustment, tighten the check-nut (2). RKP06500 20-49 PC20R-8 PC27R-8...
To INCREASE pressure, rotate in a CLOCK- WISE direction. To DECREASE pressure, rotate in a COUN- TER-CLOCKWISE direction. H Each turn of the screw (5) varies the pressure by 56 kg/cm (55 bar). 2 - Lock the nut (4). Nut: 22w2.5 Nm RKP06420 20-50 PC20R-8 PC27R-8...
2 - Stop the engine, loosen the tank cap (1) and then close it again. H This operation lets air into the tank when the level of the remaining oil is at minimum. RKP04720 3 - Start the engine and lower the working equipment to the ground. 20-51 PC20R-8 PC27R-8...
2 - Pour hydraulic oil through the hole until the entire casing is full. 3 - Replace the cap (1). Cap: PC20R-8: 16.7w2.5 Nm PC27R-8: 63.7w4.9 Nm H After filling the casing, start the engine and al- low it to run at low idling for about 10 minutes before proceding to bleed the air from the cir- cuits.
Page 169
H This method must be used for all the optional working equipment, unless otherwise indi- cated. RKP04690 1 - Each time an item of optional working equipment is installed, operate the equipment repeatedly, with the engine at low idling, until all air has been completely eliminated. 20-53 PC20R-8 PC27R-8...
8 - Stop the engine and check the position of the boom for 15 minutes. If the boom moves downwards the drift is due to the cylinder gaskets. If the boom does not move, the drift is due to the control valve. RKP04990 20-54 PC20R-8 PC27R-8...
Page 171
6 - Stop the engine and check the position of the arm for 15 minutes. If the arm moves downwards the drift is due to the cylinder gaskets. If the arm does not move, the drift is due to the control valve. RKP05010 20-55 PC20R-8 PC27R-8...
Page 172
6 - Stop the engine and check the position of the bucket for 15 minutes. If the bucket makes an opening movement the drift is due to the cylinder gaskets. If the bucket does not move, the drift is due to the control valve. 50 cm RKP05030 20-56 PC20R-8 PC27R-8...
Page 173
7 - Stop the engine and check the position of the boom for 15 minutes. If the boom makes a rotating movement the drift is due to the cylinder gaskets. If the boom does not move, the drift is due to the control valve. RKP05050 20-57 PC20R-8 PC27R-8...
Page 174
1 - Position the machine with boom, arm and bucket raised as in the figure and with the revolving frame turned 135ë to the left. 2 - Stop the engine and release the residual hydrau- lic pressures. RKP04980 20-58 PC20R-8 PC27R-8...
Page 175
If the revolving frame rotates the drift is due to either the safety valve or the control valve. RKPA2530 H To establish the cause of the drift, install a PC27R-8 new safety valve. RKPA2301 RKP05050 20-59 PC20R-8 PC27R-8...
4 - After 30 seconds, wait for a full minute to collect any leakages from the free tube. POSITION FOR THE ARM AND BUCKET TEST RKP04710 DELIVERY TUBE HEAD BOTTOM SIDE SIDE MAXIMUM PRESSURE RKP04751 20-60 PC20R-8 PC27R-8...
Page 177
6 - Bring the motor back to low speed and repeat the reading for the other direction of swing. 7 - Check that the average between the two readings falls within normal values (See «TECHNICAL DATA»). 8 - Re-assemble the hydraulic drainage circuit. RKPA2302 20-61 PC20R-8 PC27R-8...
Travel motor to the left - Forward Descent Passage not used Blade cylinder base side - Descent Blade cylinder, head side - Rise The symbols correspond to the symbols stamped onto the input and output ports of the swivel joint. 20-62 PC20R-8 PC27R-8...
Page 179
If oil leaks out of one of the two tubes of the tested actuators (adjacent lines), it means that there is a leakage of the intermediate gasket be- tween the high pressure line and the adja- cent line. RKP04761 20-63 PC20R-8 PC27R-8...
Page 180
TESTING AND ADJUSTMENTS 20-64 PC20R-8 PC27R-8...
OF OIL OR LIQUIDS TO BE INTRODUCED», «SCREW LOCKING MATERIAL, SEALANTS AND LUBRICA- TION», «LUBRICATING GREASE». NOTE If no symbol is indicated, the values to be used are those given in the introductory sections of this manual. 30-3 PC20R-8 PC27R-8...
H For details, see «20. TESTING AND ADJUSTMENTS». After having re-assembled cylinder joints or cylinders, or work equipment articulations, lubricate thoroughly. 30-4 PC20R-8 PC27R-8...
Gauge for cylinder é 50 Gauge for cylinder é 55 Gauging piston gasket ATR200990 Gauge for cylinder é 60 ATR201000 Gauge for cylinder é 70 Bushing for piston rod é 30 Mounting head Bushing for piston rod ATR201150 é 35 30-5 PC20R-8 PC27R-8...
Page 188
Nature of work Symbol Code Description Q.ty Notes Bushing for piston é 50 Bushing for piston é 55 Disassembly - assembly Assembling cylinders piston - cylinder ATR201190 Bushing for piston é 60 ATR201200 Bushing for piston é 70 30-6 PC20R-8 PC27R-8...
6 - Free the pulley (8) from the fan-belt and remove alter- nator (9). RKPA2580 INSTALLATION OF THE ALTERNATOR To install, reverse the removal procedure. H Adjust the tension of the fan belt. (For details, see «20. CONTROLS AND ADJUSTMENTS»). 30-8 PC20R-8 PC27R-8...
H Before removing pump driving gear, mark posi- tion compared to idling gear. H For removal, use a puller (X1) and tighten its screws (X2) directly in the gear (10). H During removal be careful not let key drop (11) in the housing. RKP06390 30-9 PC20R-8 PC27R-8...
RKPB6070 4 - Loosen the screws (9), remove the cooling fan (10) and the spacer (11). Take out the fan-cooling con- veyor (8). Loosen the alternator drive belt and disengage the pulley of the water pump. RKP06541 30-12 PC20R-8 PC27R-8...
Fan screws: ......Nm H Check the gaskets: Pump screws: ......Nm 30-13 PC20R-8 PC27R-8...
Page 196
7 - Remove the valves cover (11). RKPA2631 8 - Remove the rocker-arm shaft (12). H Loosen the lock nuts and unscrew the valve tap- pets by 2-3 turns. 9 - Take out the rocker-arm control rods (13). RKP06400 30-14 PC20R-8 PC27R-8...
H Raise the cylinder head, keeping it horizontal, and place it on the gasket without shifting anything. H Lubricate the screw-threadings with engine oil. H Tighten the screws in the sequence indicated. (See figure). Intake side Cylinder head screws: 68.6w1.96 Nm RKP05141 30-15 PC20R-8 PC27R-8...
RKPA2730 INSTALLATION OF THE ENGINE HOOD To install, reverse the removal procedure. H Check the alignment of the outside edges, the center- ing and the adjustment of the closing mechanism (4). RKPA2740 30-16 PC20R-8 PC27R-8...
2 - Loosen and remove the screws (2) and (3). 3 - Remove the canopy. Canopy: 73 kg RKPA2750 INSTALLATION OF CANOPY To install, reverse the removal procedure. Screw (2): 180 Nm Screw (3): 67 Nm RKPA2760 RKPA2770 30-17 PC20R-8 PC27R-8...
Page 200
3 - Attach the cab (4) to some hoisting tackle. 4 - Loosen the cab lock crews (N . 10). 5 - Take out the cab (4). Cab: 208 kg INSTALLATION OF CAB To install, reverse the removal procedure. Screw: 67 Nm RKPA279 0 30-18 PC20R-8 PC27R-8...
Page 201
H Take care not to take out completely the tube (6) and (7) from engine box. 8 - Disconnect the connector (11). RKPB5530 9 - Loosen the clips (12) and take out the tubes (6) and (7). 10 - Remove the heating fan (13). RKPA2830 30-19 PC20R-8 PC27R-8...
1 - Make sure that the heating cock is fully open. 2 - Fill up the coolant circuit. Coolant: approx. 4 3 - Start the engine to circulate the coolant and check that there are no leaks. 4 - Stop the engine and top up the level. 30-20 PC20R-8 PC27R-8...
4 - Attach the counterweight (5) to some hoisting tackle, remove the screws, and pull out the counterweight (5). INSTALLATION OF THE COUNTERWEIGHT RKPA2840 To install, reverse the removal procedure. Lateral counterweight screws: 180 Nm Counterweight screws: Loctite 262 Counterweight screws: 300 Nm 30-21 PC20R-8 PC27R-8...
Fuel tank: 14 kg RKPA2870 INSTALLATION OF THE FUEL TANK To install, reverse the removal procedure. 1 - Fill up the tank. Tank: max. 35 2 - Bleed the air from the fuel pipes and start the engine. 30-22 PC20R-8 PC27R-8...
3 - Remove the pipe (6) from oil cooler and exhaust pipe (8). RKPB6090 4 - Remove the exhaust pipe (8) (PC20R-8 N .2 - PC27R-8 . 3) in the tank. H Mark the tubes to avoid exchanging them during re-installation.
Counterweight screws: 180 Nm 2 - Start the engine at low idling to circulate the oil throughout the system. 3 - Pressurise the tank and bleed air from all circuits. (For details, see «20. CONTROLS AND ADJUST- MENTS»). 30-24 PC20R-8 PC27R-8...
3 - Disconnect pipe (5). RKPB6120 4 - Disconnect the delivery and drainage coolant pipes (6) and (7). RKPB6070 5 - Loosen the lower screws (8) and upper screws (9) and remove them. RKPB6130 30-25 PC20R-8 PC27R-8...
Page 208
H Make sure that the heating cock is fully open in the cab version. 2 - Pressurise the tank and bleed air. (For details, see «20. CONTROLS AND ADJUSTMENTS»). 3 - Stop the engine, check the level and, if necessary, top it up. 30-26 PC20R-8 PC27R-8...
6 - Disconnect the accelerator cable (16) and its sleeve. 7 - Disconnect the clips (9), the connector (10), the pre- heating cable (11), the temperature sensor cables (12), the oil pressure indicator (13) and the grounding plait (14). 13 14 RKZA2940 30-27 PC20R-8 PC27R-8...
Page 210
11 - Attach the fixed hood (19) to hoisting tackle and take out it. H Check that the motor swings completely free while it is being raised, and that no other parts are damaged. Fixed hood: 60 kg RKPA2960 12 - Remove the exhaust terminal (20). 30-28 PC20R-8 PC27R-8...
4 - Stop the engine, check the levels and, if necessary, top them up. 5 - Bleed air from the hydraulic circuits and pressurise the tank. (For details, see «20. CONTROLS AND AD- JUSTMENTS»). 30-29 PC20R-8 PC27R-8...
(4) and the suction tube (6). 5 - Attach the pump to some hoisting tackle and apply a slight tension to the cable. 6 - Loosen the screws (7) (PC20R-8 në 2 - PC27R-8 në 4) and remove the pump (8). Pump: PC20R-8 19 kg...
3 - Stop the engine, check the oil level and, if necessary, top it up. 4 - Bleed the air from the hydraulic circuits and pressur- ise the tank. (For details, see «20. CONTROLS AND ADJUSTMENTS»). 30-31 PC20R-8 PC27R-8...
2 - Loosen the screw (5) and take out the general fuse (6). 3 - Loosen the lock screws (N . 6) and take out the cover (7). RKPA2424 INSTALLATION OF THE LATERAL LOWER COVER To install, reverse the removal procedure. RKPA3020 30-32 PC20R-8 PC27R-8...
CONTROL VALVE BOX COVER To install, reverse the removal procedure. 1 - Fixed the control block cylinder support and make sure that the travel control lever, blade control lever and boom swing control pedal are locked. RKPA3040 30-33 PC20R-8 PC27R-8...
Page 216
3 - Remove the floor mat (5) and the covers (6). RKPA3060 4 - Disconnect the lever command cable from the cables (7). 5 - Disconnect the cables (8) and (9) from travel control lever, from boom swing control pedal and from brack- RKPA3070 30-34 PC20R-8 PC27R-8...
3 - Pressurise the tank and bleed air from all circuits. (For details, see «20. CONTROLS AND ADJUST- MENTS»). H Adjust the travel control lever, blade control lever and boom swing control pedal stroke. (For detail, see 20. CONTROLS AND ADJUST- MENTS). 30-35 PC20R-8 PC27R-8...
H Check carefully the positions for re-connecting the tubes. Position White White Green Green Blue Blue If the couplings are removed from the PPC valves, make sure that the coupling with a filter is mounted on input P. RKPA3120 30-36 PC20R-8 PC27R-8...
H Check carefully the positions for re-connecting the tubes. Position White White Yellow Yellow If the couplings are removed from the PPC valves, make sure that the coupling with a filter is mounted on input P. RKPA3160 30-37 PC20R-8 PC27R-8...
H Plug the tubes to prevent entry of impurities. 4 - Take out the screws (7) and remove the solenoid group (8) complete with accumulator. RKPB5570 INSTALLATION OF THE SERVOCONTROL SOLENOID GROUP To install, reverse the removal procedure. 30-38 PC20R-8 PC27R-8...
4 - Disconnect (4) and (5) from EV solenoid valve (6). H Disconnect the connectors travel increment pedal control and the equipment PPC valve pipes. RKPB5572 5 - Disconnect the cables (8) and (9) of the travel motor command e boom swing. RKPA3071 30-39 PC20R-8 PC27R-8...
Page 222
11 - Only for cabin version. H Drain the coolant. Coolant: Approx.4 12 - Disconnect the return and delivery pipes (19) and (20) to the heating fan. H Plug the tubes to prevent entry of impurities. RKPA2812 30-40 PC20R-8 PC27R-8...
Page 223
H Adjust the travel control lever and boom swing control pedal stroke (For details, see «20. CONTROLS AND ADJUSTMENTS»). H Adjust accelerator control lever and blade control lever stroke (For details, see «20. CONTROLS AND ADJUSTMENTS»). Platform screws: 320 Nm 30-41 PC20R-8 PC27R-8...
1 - Start the engine to circulate the oil, bleed air from the lower circuits and check that tubes are leaktight. 2 - Stop the engine and check the level of the tank. 3 - Pressurise the tank. 30-42 PC20R-8 PC27R-8...
Page 225
(For details, see «REMOVAL OF THE SIDE LOWER RKPA2853 PANELS»). 3 - Disconnect the tubes (2) (N . 3) RKPA3380 4 - Remove the hose-clamp (3). RKPA3390 5 - Only for canopy version. Loosen the screws (4) and remove the cover (5). RKPA3331 30-43 PC20R-8 PC27R-8...
H Mark the tubes to avoid exchanging them during re-assembly. H Plug the tubes to prevent entry of impurities. 10 - Take out the screws (15) (N . 6) and remove the swing machinery (16). Swing machinery: 32 kg RKPA2303 30-44 PC20R-8 PC27R-8...
Page 227
3 - Stop the engine, check the oil hydraulic level and, if necessary, top it up. 4 - Bleed air from the hydraulic circuits and pressurise the tank. (For details, see «20. CONTROLS AND AD- JUSTMENTS»). 30-45 PC20R-8 PC27R-8...
H Adjust the length of the cables to balance the group. 13 - Loosen and remove the two turret screws (7) left in position for safety. 14 - Remove the revolving frame (8). Revolving frame: PC20R-8: 1000 kg PC27R-8: 1400 kg RKPA3430 30-46 PC20R-8 PC27R-8...
Page 229
4 - Bleed air from the hydraulic circuits. (For details, see «20. CONTROLS AND ADJUSTMENTS»). 5 - Stop the engine, check the levels and cooling circuit and eventually top them up. 6 - Pressurise the hydraulic oil tank. (For details, see «20. CONTROLS AND ADJUSTMENTS»). 30-47 PC20R-8 PC27R-8...
1 - Remove the evolving frame (For details, see «RE- MOVAL OF THE REVOLVING FRAME»). 2 - Take out the screws (1) that secure the swing circle (2). 3 - Remove the swing circle (2). Swing circle: PC20R-8: 25 kg PC27R-8: 33 kg RKPA3440 INSTALLATION OF THE SWING CIRCLE To install, reverse the removal procedure.
4 - Insert three steel pipes into the track-shoe and then reverse the track-shoe until the first pipe is above the idler. 5 - Push the track-shoe (2) outwards and remove it. Track-shoe: PC20R-8: 88 kg PC27R-8: 117 kg Direction Steel tube...
(4) and lay it on the ground. 5 - Push down with the boom in order to raise the lower track-frame and pull out the track-shoe (4). Track-shoe: PC20R-8: 159 kg PC27R-8: 172 kg RKP06650 INSTALLATION OF STEEL TRACK-SHOES To install, reverse the removal procedure.
4 - Take out the screws (1) and their washers. 5 - Remove the sprocket wheel (2). RKP05241 Sprocket wheel: 7 kg INSTALLATION OF THE SPROCKET WHEEL To install, reverse the removal procedure. Screws: Loctite 262 Screws: 120 Nm RKPA3460 30-51 PC20R-8 PC27R-8...
To install, reverse the removal procedure. Final drive screws: Loctite 262 Final drive screws: 120 Nm 1 - Start the engine and bleed air from the travel motors. (For details, see «20. CONTROLS AND ADJUST- MENTS»). RKPA2551 30-52 PC20R-8 PC27R-8...
2 - Pull the idler (2) and recoil spring (3) out of the lower track-frame (1). RKPA3480 RKPA3490 INSTALLATION OF IDLER AND RECOIL SPRING To install, reverse the removal procedure. H Restore tension to the track-shoe. (For details, see «20. CONTROLS AND ADJUSTMENTS). 30-53 PC20R-8 PC27R-8...
2 - Take out the piston (11) out of the cylinder. 3 - Take out the snap ring (12), the gasket (13), the spacer (14), the anti-extrusion ring (15), and the O- ring (16). Assembly To re-assemble, reverse the dismantling procedure. RKP06250 30-54 PC20R-8 PC27R-8...
4 - Remove the bushings (8). ASSEMBLY OF THE IDLER To re-assemble, reverse the dismantling procedure. H Use a press for the final assembly. 1 - Fill up with oil. Oil: 70 cc. 2 - Tightening the cap (1). RKP06260 30-55 PC20R-8 PC27R-8...
H Slowly lower the lower track-frame (2) until the rollers (5) rest fully on the track-shoe, then finish tightening the screws (4). Roller screws: Loctite 262 Roller screws: 170 Nm H Restore the track-shoe tension. (For details, see RKPA3272 «20. CONTROLS AND ADJUSTMENTS»). 30-56 PC20R-8 PC27R-8...
7 - Disconnect the tubes (6) and plug them. Also plug the holes in the cylinder to prevent entry of impurities. 9 - Remove the pin (7). RKPA3530 10 - Remove the cylinder (4). Boom cylinder: PC20R-8: 20 kg PC27R-8: 25 kg 30-57 PC20R-8 PC27R-8...
Internal bushings: ASL800050 1 - Start the engine and bleed the air from the cylinder. (For details, see «20. CONTROLS AND ADJUST- MENTS»). H After bleeding the air, check the level of oil in the tank. RKP06280 30-58 PC20R-8 PC27R-8...
6 - Disconnect the tubes (4) and plug them. Also plug the holes in the cylinder to prevent the entry of impurities. 7 - Remove the pin (5). 8 - Remove the cylinder (1). Arm cylinder: PC20R-8: 20 kg PC27R-8: 28 kg RKPA3570 INSTALLATION OF THE ARM CYLINDER To install, reverse the removal procedure.
RKPA3600 6 - Put a sling round the cylinder (1). 7 - Remove the pin (5). 8 - Remove the cylinder (1). Bucket cylinder: PC20R-8: 11 kg PC27R-8: 12 kg INSTALLATION OF THE MAX.1mm BUCKET CYLINDER To install, reverse the removal procedure.
Page 243
H Disconnect first the negative terminal (±) and then the positive terminal (+). RKPA3411 7 - Disconnect the hoses (4) and plug them. Also plug the holes in the cylinder to prevent the entry of impu- rities. RKPA3630 30-61 PC20R-8 PC27R-8...
9 - Put a sling round the cylinder (10) and apply a slight tension to the cables. 10 - Take out the pin (11) and remove the cylinder (10). Boom swing cylinder: PC20R-8: 17 kg PC27R-8: 22 kg INSTALLATION OF THE...
Do not insert fingers in the holes to check alignment. Internal bushings: ASL800040 Start the engine and bleed the air from the cylinder. (For details, see «20. CONTROLS AND ADJUST- MENTS»). H After bleeding the air, check the oil level in the tank. 30-63 PC20R-8 PC27R-8...
Page 246
3 - Attach the special wrench C5 (adjusted to fit the cylin- der) to the head (3) and apply the dynamometric tool RKPA1400 4 - Unscrew the head (3) and extract it completely from the cylinder (2). RKPA1410 30-64 PC20R-8 PC27R-8...
Page 247
Boom Bucket Blade swing Model PC20R-8 PC27R-8 RKPA1430 10 - Take all the groups to pieces and remove all the seals, guard rings and guide rings. The seals, guard rings, and guide rings cannot be used again. 30-65 PC20R-8 PC27R-8...
Page 248
4 - Mount the O-ring (10), the anti-extrusion ring (11) and the O-ring (12) onto the cylinder head (3). 11 12 H Only for the boom cylinders. In sequence mount the anti-extrusion ring (17), the O-ring (18) and the 2nd anti-extrusion ring (17). RKZ05260 30-66 PC20R-8 PC27R-8...
Page 249
3 - Mount the pilot boss C10 adapted to the diameter onto the extremity of the piston rod. 4 - Slide the head (3) onto the piston rod (4). 5 - Remove the pilot boss C10 from the extremity of the piston rod. RKPA1490 30-67 PC20R-8 PC27R-8...
Page 250
REMOVAL AND INSTALLATION WORK EQUIPMENT CYLINDERS 6 - For the boom cylinders. Mount the brake bushing (19). H For the boom cylinder for the PC20R-8, also 19 20 mount the spacer (20). H Carefully check the orientation of the chamfer on the brake bushing.
Page 251
Boom Boom Bucket Blade swing Model PC20R-8 490w49 490w49 412w41 539w54 490w49 PC27R-8 490w49 490w49 412w41 539w54 490w49 12 - Mount the guard rings (1) on both sides of the cylin- der and the piston rod. RKPA1401 30-69 PC20R-8 PC27R-8...
Page 252
H Remove the fixed working beam clips. RKPA3670 9 - Put a sling around the equipment and apply a slight tension to the cables. H Adjust the length of the cables to balance the load. RKPA3680 30-70 PC20R-8 PC27R-8...
10 - Take away the pin (8). Remove the working equip- ment (9). H Check and make a note of the position of the shim. Working equipment: PC20R-8: 230 kg PC27R-8: 310 kg RKPA3690 INSTALLATION OF THE UPPER WORK EQUIPMENT MAX.1mm...
Page 254
2 - Take out the safety pin (5) and remove the pin (6) that connects the bucket (3) to the arm (7). 3 - Remove the bucket (3). RKPA3700 Bucket: PC20R-8: 40 kg PC27R-8: 50 kg INSTALLATION OF THE BUCKET To install, reverse the removal procedure.
Page 255
10 - Put a sling round the arm (10) and apply a slight ten- sion to the cables. 11 - Remove the pin (11) and take out the arm (10). Arm: PC20R-8: 35 kg PC27R-8: 50 kg Long arm: PC20R-8: 48 kg PC27R-8: 70 kg RKPA3740 30-73 PC20R-8 PC27R-8...
Page 256
Start the engine to circulate the oil and bleed the air MAX.1mm from the cylinder. RKP06340 H After bleeding the air, stop the engine and check the oil level in the tank. 30-74 PC20R-8 PC27R-8...
6 - Disconnect the delivery and exhaust equipment tubes (5). H Plug the tubes to prevent entry of impurities. 7 - Remove the pin (6) and take out the arm complete (7). Arm complete: PC20R-8: 115 kg PC27R-8: 160 kg RKPA3572 INSTALLATION OF THE ARM ASSEMBLY To install, reverse the removal procedure.
11 - Disconnect the hoses (6) (N . 10); plug the tubes to prevent entry of impurities. H Remove the wiring harness lock clips. 12 - Remove the pin (7) and remove the boom (2). Boom: PC20R-8: 80 kg PC27R-8: 126 kg RKPA3522 RKPA3780 30-76...
Page 259
Start the engine to circulate the oil and bleed the air from the cylinder. H After bleeding the air, stop the engine and check the oil level in the tank. 30-77 PC20R-8 PC27R-8...
7 - Take out the bracket (5), remove the pin (6) and re- move the boom swing support (4). H Make a note of the position of the spacer (7) and the quantity of shims (8). Boom swing support: PC20R-8: 37 kg PC27R-8: 52 kg RKPA3830 INSTALLATION OF THE BOOM SWING SUPPORT To install, reverse the removal procedure.
Page 261
H Adjust the length of the cables to balance the group. 4 - Take out the pin (3). RKPA3800 5 - Remove the blade (4). Blade: PC20R-8: 100 kg PC27R-8: 137 kg INSTALLATION OF THE BLADE To install, reverse the removal procedure. Internal bushings: ASL800050...
Page 262
REMOVAL AND INSTALLATION 30-80 PC20R-8 PC27R-8...
SWING CIRCLE M The figure represent PC20R-8 130 Nm with Loctite 262 130 Nm with Loctite 262 RKP01530 Unit: mm Check item Criteria Remedy Standard clearance Clearance limit Axial bearing clearance Replace 40-2 PC20R-8 PC27R-8...
Clearance between 0.15 0.35 planetary gear and ring gear Replace Clearance between pinion and 0.30 0.70 swing circle teething Standard size Repair limit Size of pinion in the zone of contact with the sealing ring 49.5 0.19 40-3 PC20R-8 PC27R-8...
Backlash between Replace . 2 sun gear and 0.10 0.30 . 2 planetary gear Backlash between . 1 sun gear and 0.10 0.30 . 1 planetary gear Axial play of sun gear 0.5 ± 1.5 40-4 PC20R-8 PC27R-8...
344.3 ± 2 Wear at tips of Build up by 386.2 w1.5 sprocket teeth solder or replace Face width at tips of Ð sprocket teeth Face width at base +0.5 of sprocket teeth ± 1 40-5 PC20R-8 PC27R-8...
Width of tread Tolerance Standard Standard Clearance size clearance limit Clearance between Shaft Hole bushing and idler ± 0.025 + 0.142 0.105 ± Replace ± 0.064 + 0.080 0.206 Standard size Repair limixt Clearance between shaft and support 0.25 40-7 PC20R-8 PC27R-8...
0.22 +0.12 + 0.05 Interference between +0.15 0.07 0.15 Replace pin and link +0.12 + 0.05 Interference between +0.02 0.02 0.12 master pin and link +0.07 + 0.05 Standard size Clearance limit Clearance between link joint faces 40-10 PC20R-8 PC27R-8...
Page 275
RUBBER SHOE Section A ± A Sezione A - A RKP01730 Unit: mm Check item Criteria Remedy Standard size Repair limit Wear of lug height Replace Wear of roller guard portion Wear of meshing portion of sprocket 40-11 PC20R-8 PC27R-8...
Page 279
44.1w4.9 Nm (4.5w0.5 kgm) 44.1w4.9 Nm (4.5w0.5 kgm) Section A ± A Sezione A - A RKP01661 40-15 PC20R-8 PC27R-8...
Page 280
(1.84 kg) is found, replace the Spool return spring 98 N 78.4 N 46.2x20 25.4 Ð spring (boom, blade) (10 kg) (8 kg) Spool return spring 74.5 N 59.6 N 42x20 25.4 Ð (travel) (7.6 kg) (6.1 kg) 40-16 PC20R-8 PC27R-8...
Page 281
Cooler check valve spring 29.1x18.7 Ð (8.4 kg) (6.7 kg) Back pressure check 78.8 N 63 N 27.2x13.2 Ð valve spring (8.04 kg) (6.43 kg) 22.6 N 18.1 N Spool return spring (hammer) 29x17.5 28.5 Ð (2.3 kg) (1.84 kg) 40-17 PC20R-8 PC27R-8...
Page 282
Repair limit When damage or Free length Installed Installed Free Installed Check valve spring deformation x é.D. length load length load (arm) is found, replace the 1.96 N 1.57 N 21.9x5 15.8 Ð spring (0.2 kg) (0.16 kg) 40-18 PC20R-8 PC27R-8...
Page 283
é.D. length load length load deformation 1.96 N 1.57 N is found, 21.9x5 15.8 Ð (0.2 kg) (0.16 kg) replace the spring 83.3 N 66.6 N Pilot relief valve spring 32.4x10.4 Ð (8.5 kg) (6.8 kg) 40-19 PC20R-8 PC27R-8...
Sezione A - A Unit: mm Check item Criteria Remedy Standard size Repair limit When damage or Free length Installed Installed Free Installed deformation Suction valve spring x é.D. length load length load is found, replace the spring 40-21 PC20R-8 PC27R-8...
Page 286
30.1 15.7 2.3 N 25.5 1.6 N Standard clearance Clearance limit Clearance between piston and cylinder 0.03 ± 0.15 Replace Clearance between 0.01 ± 0.02 shoe and piston 40-22 PC20R-8 PC27R-8...
Page 287
PAGE INTENTIONALLY LEFT BLANK 40-23 PC20R-8 PC27R-8...
TRAVEL MOTOR 63.7w5 Nm 34.3w5 Nm B B B 31.9w2.5 Nm 240w5 Nm 2.5w0.5 Nm 2.5w0.5 Nm 10w1 Nm Section A ± A Sezione A - A RKP01381 40-24 PC20R-8 PC27R-8...
Page 289
15.7 7.8 N 13.9 6.3 N is found, replace the Braking valve return spring 24.7 60 N 28.1 48 N spring Travel increment 29.5 68 N 34.7 54 N spool return spring 40-25 PC20R-8 PC27R-8...
(1.0 kg) (0.8 kg) is found, replace the Centering spring 17.7 N 14.1 N spring 42.5x15.5 Ð (P1 and P2 port) (1.8 kg) (1.44 kg) 16.7 N 13.7 N Metering spring 26.5x9.2 24.9 Ð (1.7 kg) (1.4 kg) 40-26 PC20R-8 PC27R-8...
Installed Installed Free Installed Centering spring x é.D. length load length load Replace 308.7 N 277.5 N 54.4x21.2 40.5 53.1 (31.5 kg) (28.3 kg) 24.5 N 21.6 N Metering spring 25.9x11.0 25.0 25.8 (2.5 kg) (2.2 kg) 40-27 PC20R-8 PC27R-8...
Sezione B - B Section A ± A Sezione A - A Section G ± G Section F ± F Sezione G - G Sezione F - F Section E ± E Sezione E - E RKP01750 40-30 PC20R-8 PC27R-8...
Page 295
+ 0.117 0.170 ± and mounting pin of bucket ± 0.130 + 0.080 0.247 and link Clearance between bushing ± 0.090 + 0.145 0.170 ± and mounting pin of track ± 0.130 + 0.080 0.275 frame and blade 40-31 PC20R-8 PC27R-8...
Page 296
Sezione B - B Section A ± A Sezione A - A Section G ± G Section F ± F Sezione G - G Sezione F - F Section E ± E Sezione E - E RKP01740 40-32 PC20R-8 PC27R-8...
Page 297
+ 0.142 0.170 ± and mounting pin of bucket ± 0.130 + 0.080 0.272 and link Clearance between bushing ± 0.090 + 0.142 0.170 ± and mounting pin of track ± 0.130 + 0.080 0.272 frame and blade 40-33 PC20R-8 PC27R-8...