free stats
Download Print this page

Advertisement

Quick Links

MT2420
Lenovo MT-2420 Model S
Installation Manual

Advertisement

loading

Summary of Contents for Lenovo MT-2420 S

  • Page 1 MT2420 Lenovo MT-2420 Model S Installation Manual...
  • Page 2 Accessories list Item Picture Spec Quantity Combine screws TWM5* 12, silver plated, flat tail Combine screws TWM4*12, electroplating silver, flat tail Plastic Iron gaskets,Ø 8mm*50 • Sinking tip tail, cross groove HA5 x 50 (bud • Self-tapping screws length), electroplating silver Iron gaskets Plating parts, 6 x 13 x 2MM •...
  • Page 3 Accessories list Item Picture Spec Quantity Cross groove sink flat tail machine teeth ,KM4*8 screw Silver plated size: 220 x 158 x 20mm Wall-bracket size: 230 x 160 x 45mm Kiosk-bracket...
  • Page 4 01 On the Wall Step 1:Install the wall-bracket on the wall. Step 2:Install the kiosk-bracket. Note: You can find the wall bracket and kiosk bracket in the shipping package.
  • Page 5 01 On the Wall Step 3: Plug in power cable and net Step 4: Align the holes and hang the kiosk on cable. the wall-bracket, and screw the two brackets together.
  • Page 6 02 On the Table Step 1:Install the U-shape frame to the Step 2: Screw the frame to fix the kiosk to the kiosk and tighten the screws. table.
  • Page 7 03 On the Stand Step 1: Thread the power cable and Step 2: Install the wall-bracket. net cable through the route in the stand.
  • Page 8 03 On the Stand Pull the kiosk Step 4: Hang the kiosk on the wall-bracket , and Step 3:Install the kiosk-bracket. pull the kiosk aside to plug in the cables.
  • Page 9 03 On the Stand Step 5: Screw the two brackets together.
  • Page 10 04 On the Cabinet Step 1: Thread the power cable and net Step 2: Install the wall-bracket. cable through the route in the cabinet.
  • Page 11 04 On the Cabinet Pull the kiosk Step 4: Hang the kiosk on the wall-bracket , and Step 3:Install the kiosk-bracket. pull the kiosk aside to plug in the cables.
  • Page 12 04 On the Cabinet Step 5: Screw the two brackets together.
  • Page 13 Verify Install ⚫ Steps to test stability 1. Depending on the way the fixed equipment is used on the customer’s onsite; 2. Refer to Page4 Step4 or Page8 Step4 or Page12 Step5;Firstly, hang the device on the wall bracket to see if the overall level is horizontal; 3.
  • Page 14 05 Power supply suggestion ⚫ In the installation site, need to provide independent power supply for the self-checkout Input: AC 110~220V power supply, ground wire must be connected to the earth; Between the main power supply and the self-service terminal, it should be protected by leakage protection switch. ⚫...
  • Page 15 Printed in China ©Copyright Lenovo, 2020 All right reserved...