Sign In
Upload
Manuals
Brands
Hitachi Manuals
Network Hardware
3090 G2
Hitachi 3090 G2 Manuals
Manuals and User Guides for Hitachi 3090 G2. We have
2
Hitachi 3090 G2 manuals available for free PDF download: Hardware Reference Manual
Hitachi 3090 G2 Hardware Reference Manual (129 pages)
Hitachi NAS Platform
Brand:
Hitachi
| Category:
Network Hardware
| Size: 3.96 MB
Table of Contents
Table of Contents
4
Preface
8
Contacting Hitachi Data Systems
8
Related Documentation
8
About this Manual
12
Audience
13
Conventions
13
Related Documentation
17
Safety Information
20
Electrostatic Discharge Precautions
21
Safety and Handling Precautions
21
Electrical Precautions
22
Data Protection Precautions
22
Mandatory Regulations
24
International Standards
25
Federal Communications Commission (FCC)
25
European Union (EU) Statement
26
Canadian Department of Communication Compliance Statement
26
Avis de Conformité Aux Normes du Ministère des Communications du Canada
27
Radio Protection for Germany
27
Food and Drug Administration (FDA)
27
Chinese Rohs Compliance Statement
27
System Overview
30
System Components
31
Server Specifications
32
Attaching a Rack Stabilizer Plate
34
Hitachi NAS Platform Server Components
36
Ventilation
38
Server Front Panel
38
LED Status Indicators
39
NVRAM Backup Battery Pack
42
Hard Disk Drives
44
Fans
45
Server Rear Panel
46
Rear Panel Server LED and Button Locations
48
Rear Panel LED State Descriptions
48
Power Button (PWR)
49
Reset Button (RST)
50
Fibre Channel Storage Ports
50
10/100 Private Ethernet Ports
51
GE Ethernet Network Ports
52
10 Gbe Ports
52
10 Gigabit Ethernet Cluster Interconnect Ports
52
10 Gigabit Ethernet Customer Data Network Ports
53
Power Supply Units
54
Ethernet Management Ports 0 and 1
56
Serial Port
56
USB Ports
56
Management Interfaces
56
RS-232 Serial Management Port
57
10/100/1000 Ethernet Management Ports
58
Ethernet Cables
58
Replacing Server Components
60
Field-Replaceable Units
61
Hot-Swappable Components
61
Removing and Replacing the Front Bezel
62
Bezel Removal
62
Bezel Replacement
62
Replacing a Fan
62
Replacing the NVRAM Backup Battery Pack
64
Checking Battery Pack Status
64
Identifying a Cluster Node that Requires Battery Replacement
65
Replacing the NVRAM Battery Module
66
Replacing a Hard Disk
67
Deciding on Hard Disk Recovery or Replacement
67
Replacing a Hard Disk Drive
68
Synchronizing a New Disk
70
Replacing a Power Supply Unit
71
Replacing an FPGA Board as a FRU
72
Requirements for Replacing FPGA Board
73
Replacing the FPGA Board
73
Rebooting, Shutting Down, and Powering off
80
Rebooting or Shutting down a Server
81
Rebooting or Shutting down a Cluster
82
Restarting an Unresponsive Server
83
Powering down the Server for Maintenance
85
Powering down the Server for Shipment or Storage
85
Powering on the Server or Cluster
86
Recovering from Power Standby
87
Server Replacement Procedures
88
Replacement Procedure Overview
89
Requirements
89
Swapping Components
89
Model Selection
90
MAC ID and License Keys
90
Previous Backups
90
Upgrades
91
Replacing a Single Server with an Embedded SMU
91
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
91
Shutting down the Server You Are Replacing
93
Configuring the Replacement Server
95
Finalizing and Verifying the Replacement Server Configuration
97
Replacing a Single Server with an External SMU
99
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
99
Shutting down the Server You Are Replacing
101
Configuring the Replacement Server
103
Finalizing and Verifying the Replacement Server Configuration
105
Replacing a Node Within a Cluster
107
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
107
Shutting down the Server You Are Replacing
109
Configuring the Replacement Server
111
Finalizing and Verifying the Server Configuration
113
Replacing All Servers Within a Cluster
116
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
116
Shutting down the Servers You Are Replacing
118
Configuring the Replacement Servers
120
Finalizing and Verifying the System Configuration
122
B Parts List for 3080/3090 G2 Servers
124
Advertisement
Hitachi 3090 G2 Hardware Reference Manual (112 pages)
NAS Platform
Brand:
Hitachi
| Category:
Storage
| Size: 2.46 MB
Table of Contents
Table of Contents
3
Preface
7
Related Documentation
7
Accessing Product Documentation
10
Getting Help
10
Comments
11
Chapter 1: About this Manual
12
Audience
12
Conventions
12
Chapter 2: Safety Information
16
Electrostatic Discharge Precautions
16
Safety and Handling Precautions
16
Electrical Precautions
18
Data Protection Precautions
18
Chapter 3: Mandatory Regulations
20
International Standards
20
Federal Communications Commission (FCC)
21
European Union (EU) Statement
21
Canadian Department of Communication Compliance Statement
22
Avis de Conformité aux Normes du Ministère des Communications du Canada
22
Radio Protection for Germany
22
Food and Drug Administration (FDA)
22
Chinese Rohs Compliance Statement
22
South Africa: ICASA
23
Chapter 4: System Overview
24
System Components
24
Server Specifications
25
Attaching a Rack Stabilizer Plate
27
Chapter 5: Hitachi NAS Platform Server Components
28
Ventilation
28
Server Front Panel
29
LED Status Indicators
31
NVRAM Backup Battery Pack
34
Hard Disk Drives
36
Fans
37
Server Rear Panel
38
Rear Panel Server LED and Button Locations
40
Rear Panel LED State Descriptions
40
Power Button (PWR)
41
Reset Button (RST)
42
Fibre Channel Storage Ports
42
10/100 Private Ethernet Ports
43
GE Ethernet Network Ports
43
10 Gbe Ports
44
10 Gigabit Ethernet Cluster Interconnect Ports
44
10 Gigabit Ethernet Customer Data Network Ports
45
Power Supply Units
46
Ethernet Management Ports 0 and 1
48
Serial Port
48
10/100/1000 Ethernet Management Ports
48
USB Ports
48
Management Interfaces
48
RS-232 Serial Management Port
49
10/100/1000 Ethernet Management Ports
50
Ethernet Cables
50
Chapter 6: Replacing Server Components
51
Field-Replaceable Units
51
Hot-Swappable Components
51
Removing and Replacing the Front Bezel
52
Bezel Removal
52
Bezel Replacement
52
Replacing a Fan
52
Replacing the NVRAM Backup Battery Pack
54
Checking Battery Pack Status
54
Identifying a Cluster Node that Requires Battery Replacement
55
Replacing the NVRAM Battery Module
55
Collecting System Backups and Diagnostics
56
Resetting the Battery Age and Restarting the Chassis Monitor
57
Collecting a Final Diagnostic
58
Replacing a Hard Disk
59
Deciding on Hard Disk Recovery or Replacement
59
Replacing a Hard Disk Drive
60
Synchronizing a New Disk
62
Replacing a Power Supply Unit
63
Replacing an FPGA Board as a FRU
65
Requirements for Replacing FPGA Board
65
Replacing the FPGA Board
65
Chapter 7: Rebooting, Shutting Down, and Powering off
69
Rebooting or Shutting down a Server
69
Rebooting or Shutting down a Cluster
70
Restarting an Unresponsive Server
71
Powering down the Server for Maintenance
73
Powering down the Server for Shipment or Storage
73
Powering on the Server or Cluster
74
Recovering from Power Standby
75
Appendix A: Server Replacement Procedures
76
Replacement Procedure Overview
76
Requirements
76
Swapping Components
77
Model Selection
77
MAC ID and License Keys
77
Previous Backups
78
Upgrades
78
Manually Installing an Embedded SMU (if Necessary)
78
Replacing a Single Server with an Embedded SMU
79
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
79
Shutting down the Server You Are Replacing
81
Configuring the Replacement Server
83
Finalizing and Verifying the Replacement Server Configuration
85
Replacing a Single Server with an External SMU
87
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
87
Shutting down the Server You Are Replacing
89
Configuring the Replacement Server
91
Finalizing and Verifying the Replacement Server Configuration
93
Replacing a Node Within a Cluster
95
Capturing Information from the Existing Node
95
Preparing the New Node
96
Preparing the Old Node for Removal
97
Installing the New Node
97
Finalizing and Verifying the Server Configuration
98
Replacing All Servers Within a Cluster
101
Obtaining Backups, Diagnostics, Firmware Levels, and License Keys
101
Shutting down the Servers You Are Replacing
103
Configuring the Replacement Servers
105
Finalizing and Verifying the System Configuration
106
Appendix B: Parts List for 3080/3090 G2 Servers
108
Advertisement
Related Products
Hitachi 3080 G2
Hitachi 3090
Hitachi 3090 G1
Hitachi WirelessIP 3000
Hitachi 3080
Hitachi 3000 Series
Hitachi 300001
Hitachi ZAXIS 300LC-7
Hitachi airHome 300 CJ Series
Hitachi airHome 300 RAK-CJ18PCASM
Hitachi Categories
Projector
Air Conditioner
Drill
Power Tool
TV
More Hitachi Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL