Huawei FusionModule2000 V500R003C10 Installation Manual (318 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Server
| Size: 26.31 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Safety Precautions
10
General Safety Precautions
10
Electrical Safety
11
Battery Safety
13
Mechanical Safety
15
Others
16
2 Installation Preparations
17
Precautions for Transportation and Placing
17
Unpacking and Acceptance
18
Installation Environment Check
19
Site Requirements
21
Documentation Preparations
22
Tools and Instruments
23
Personnel Requirements
27
Scenario Description
27
Power Supply and Distribution Cabinet Scenario (Dual-Row)
28
Power Supply and Distribution Cabinet Scenario (Single-Row)
29
Smart Busway Scenario (Dual-Row)
30
Smart Busway Scenario (Single-Row)
31
3 Smart Module Layout Requirements
33
Layout Requirements for Standard Dual-Row Aisle Containment
33
Layout Requirements for Standard Single-Row Aisle Containment
34
Layout Requirements for Dual-Row Aisle Containment with a Column
36
Layout Requirements for Single-Row Aisle Containment with a Column
42
Optional) Installing Bases
49
Precautions for Installing Bases
49
Installing Bases with Adjustable Dimensions
50
Installing Bases with Fixed Dimensions
55
Optional) Adjusting Adjustable Feet of Air Conditioner Bases (300 MM Wide)
55
Optional) Adjusting Adjustable Feet of Air Conditioner and PDC Bases (600 MM Wide)
57
Installing Bases with Fixed Dimensions
59
Connecting Base Ground Cables
61
5 Installing the PDC
63
Moving the PDC
63
Installing a Tail Frame
65
Optional) Installing a Top Frame
65
6 Installing the Network Cabinet, IT Cabinet, and Battery Cabinet
67
Moving the Network Cabinet, IT Cabinet, and Battery Cabinet
67
Optional) Installing Side Plates for IT Cabinets
68
Optional) Taking out Rpdu Cables
70
Optional) Taking out Industrial Connectors
70
Optional) Adjusting Battery Cabinet Side Plates
72
Optional) Installing a Battery Cabinet Top Frame
72
Optional) Installing a Horizontal Ground Bar
72
Optional) Installing a Vertical Ground Bar
73
Optional) Setting a Cabinet Code Lock
74
7 Installing Air Conditioners
78
Optional) Installing Netcol5000-A 25 Kw Air Conditioners
78
Optional) Installing Top Frames (Top Pipe Routing)
78
Optional) Installing Top Frames (Bottom Pipe Routing)
80
Optional) Installing a 300 MM Wide Air Conditioner Adaptive Frame
81
Optional) Installing a Top Frame for an Adaptive Frame
84
Optional) Installing Netcol5000-A 42 Kw Air Conditioners
85
Optional) Installing a 600 MM Wide Air Conditioner Enclosure Frame
85
Optional) Installing Top Frames (Top Pipe Routing)
89
Optional) Installing Top Frames (Bottom Pipe Routing)
91
Installing Air Conditioner Outdoor Units and Routing Pipes
91
8 Combining Cabinets
92
9 Grounding Cabinets
97
10 Installing the Aisle Containment
101
Installing Sealing Plates (Single-Row Scenario)
101
Installing Sealing Plates Around a Column (in Scenarios with a Column)
104
Installing Skylights
106
Installing Control, Flat, and Rotating Skylights
106
Installing Adjustable Skylights (in Scenarios with a Column)
109
Optional) Grounding Control Skylights
116
Installing the Cabinet Bottom Sealing Plate
116
Installing End Doors
120
Installing Sliding Doors (Dual-Row 2000 MM)
121
Installing Sliding Doors (Dual-Row 2200 MM)
130
Installing Revolving Doors (Single-Row and Dual-Row 2000 MM)
137
Installing Revolving Doors (Single-Row and Dual-Row 2200 MM)
149
Attaching Cabinet Labels
157
11 Installing Cable Troughs and Cable Trays
160
Optional) Installing Cable Troughs
160
Optional) Installing a New Main Way
160
Installing Cable Troughs (600 MM or 800 MM Wide)
160
Installing Cable Troughs (300 MM Wide)
165
Installing End Panels for Cable Troughs
166
Installing Cable Trays
167
Optional) Installing Cable Trays (Dual-Row Aisle Containment)
167
Installing Cable Trays (in Scenarios with a Column)
169
Optional) Installing Indoor Cable Trays
173
Optional) Grounding Cable Trays
173
Optional) Installing Aisle Lights
174
Optional) Installing Dehumidifiers
180
14 Installing Power Supply and Distribution Devices
185
Optional) Installing the UPS Outside the Smart Module
185
Optional) Installing a Battery Cabinet Outside the Smart Module
185
Optional) Installing Batteries
185
Optional) Installing an Air Conditioner PDB
186
15 Installing Monitoring Devices
188
Equipment Layout in the Network Cabinet
188
Optional) Installing an RH2288 Server
189
Optional) Installing a VCN500
191
Optional) Installing a LAN Switch
193
Installing an ECC800
194
Optional) Installing a Rack Environment Unit
198
Installing Monitoring Devices on a Control Skylight
199
Installing a Rotating Skylight Magnetic Lock
200
Installing a Camera
201
Optional) Installing a Smoke Detector
205
Optional) Installing Multi-Functional Sensors
205
Installing Monitoring Devices on the End Door
207
Monitoring Component Layout for the Sliding Door
207
Monitoring Component Layout for the Revolving Door (Dual-Row Scenario)
208
Monitoring Component Layout for the Revolving Door (Single-Row Scenario)
209
Installing an Actuator or Converter
209
Installing an Alarm Beacon
212
Optional) Installing a Revolving Door Magnetic Lock
213
Optional) Installing a Sliding Door Magnetic Lock
217
Installing a Button
219
Installing a Monitoring Device on the Pad Mounting Kit
220
Optional) Installing a Fingerprint and Card Reader
222
Optional) Installing a Fingerprint and Card Reader with a Keypad
223
Optional) Installing a Card Reader with a Keypad
224
Optional) Installing an IC Card Reader
225
Installing a Pad Power Connector
227
Installing a Pad
230
Securing the Pad Mounting Kit
231
Installing Monitoring Devices on Cable Troughs
234
Layout of Smart ETH Gateways (Dual-Row Scenario)
234
Layout of Smart ETH Gateways (Single-Row Scenario)
235
Installing a Smart ETH Gateway
237
Optional) Installing Temperature Sensors
238
Rules for Deploying T/H Sensors
240
Installing a Temperature and Humidity Sensor
241
Installing a WLDS900 Water Sensor
243
Laying out the Water Detection Cable (Dual-Row Scenario)
244
Laying out the Water Detection Cable (Single-Row Scenario)
246
Connecting a Cable to the WLDS900 Water Sensor
247
Routing a Water Detection Cable
249
Installing a GSM Modem
251
Advertisement
Huawei FusionModule2000 V500R003C10 Installation Manual (263 pages)
Smart Modular Data Center, 2000 mm High Cabinets, Single-Row Aisle Containment, 380 V
Brand:
Huawei
| Category:
Storage
| Size: 21.59 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Installation Preparations
10
Precautions for Transportation
10
Unpacking and Acceptance
11
Installation Environment Requirements
12
Site Requirements
14
Documents
15
Tools and Instruments
17
Tools Delivered with Equipment
21
Personnel Requirements
23
Installation Process
24
2 Scenario Description
25
3 Hardware Installation Preparations
27
Preparing for Installing Air Conditioners
27
Material Preparations
27
Preparing for Installing the Netcol5000-A 35 Kw Air Conditioner
27
Optional) Refrigerant R410A
27
Refrigerant Oil
29
Pipe Components
29
Humidifier Water Inlet Pipe, Pump Drainpipe, and Automatic Drainpipe
30
Pipe Support
32
Preparing Cables
32
Checking the Air Pressure
33
Removing the Transport Fasteners from Floats
35
Removing the Transport Fasteners from a Compressor
37
Preparing for Installing the Netcol5000-A 25 Kw Air Conditioner
38
Optional) Refrigerant R410A
38
Optional) Refrigerant Oil
40
Optional) Oil Trap and Inverted Trap
40
Humidifier Water Inlet Pipe
41
Drainpipe
42
Pipe Support
43
Preparing Cables
43
Engineering Procurement) Water Softener
45
Checking Nitrogen Pressure
46
Removing the Transport Fasteners
47
Removing Pallets
50
Removing the PDC Pallet
50
Removing the IT Cabinet Pallet
53
Removing the Netcol5000-A 35 Kw Air Conditioner Pallet
54
Removing the Netcol5000-A 25 Kw Air Conditioner Pallet
54
Optional) Adjusting IT Cabinet Side Plates
55
Optional) Adjusting Battery Cabinet Side Plates
56
Optional) Installing the PDC Tail Frame
57
Optional) Installing a 600 MM Wide Air Conditioner Enclosure Frame
62
Optional) Installing a 300 MM Wide Air Conditioner Enclosure Frame
66
Optional) Installing Bases
67
Precautions for Installing the Base
67
Installing Adjustable Bases
68
Installing a Cabinet Base
68
Assembling a Base
68
Positioning Bases
70
Securing Bases
72
Installing Fixed-Size Bases
74
Deploying a 300 MM Wide Air Conditioner Base
74
Deploying Bases for a 600 MM Wide IT Cabinet/Battery Cabinet/Network Cabinet
76
Deploying Bases for a 600 MM Wide Air Conditioner and PDC
76
Deploying 800 MM Wide Fixed Bases
79
Securing Bases
79
Installing Air Conditioner Outdoor Units and Routing Pipes
81
4 Installing Cabinets
83
Installing Cabinets (with Bases)
83
Installing Cabinets (Without Bases)
86
Installing Cabinet Accessories
89
Optional) Taking out PDU2000 Cables and Industrial Connectors
89
Optional) Installing a Branch Ground Copper Bar
91
Optional) Installing a Vertical Ground Copper Bar
92
Optional) Setting a Cabinet Code Lock
93
5 Installing the Contained Aisles
98
Installing a Sealing Plate
98
Installing Skylights
100
Skylight Overview
100
MM Wide Control Skylight
100
MM Wide Flat or Rotating Skylight
101
MM Wide Flat or Rotating Skylight
102
MM Wide Flat Skylight
103
Securing Skylights
104
Installing a Rotating Skylight Magnetic Lock
105
Installing End Doors
106
Installing a Lower Mounting Kit for the End Door
107
Installing a Revolving Door
109
Attaching Cabinet Labels
119
Optional) Installing Aisle Lights
120
Optional) Installing Cable Troughs
124
Installing a 600 MM Wide Cable Trough
124
Installing a 300 MM Wide Cable Trough
128
Installing an 800 MM Wide Cable Trough
130
Installing End Panels for Cable Troughs
130
7 Installing Monitoring Devices
132
Device Layout in the Network Cabinet
132
Optional) Installing a Server
133
Optional) Installing a VCN500
135
Optional) Installing a LAN Switch
136
Installing an ECC800
138
Optional) Installing a Rack Environment Unit
140
Installing Monitoring Components on a Control Skylight
141
Installing a Camera
142
Optional) Installing a Smoke Detector
146
Optional) Installing the Multi-Functional Sensor
146
Optional) Installing Monitoring Components on the End Door
148
Monitoring Component Layout for the Revolving Door
148
Installing an Actuator or Converter
148
Installing an Alarm Beacon
151
Optional) Installing a Revolving Door Magnetic Lock
152
Installing Buttons
157
Installing the Pad Mounting Kit
158
Installing a Fingerprint and Card Reader
159
Installing a Fingerprint and Card Reader with a Keypad
160
Installing a Card Reader with a Keypad
161
Installing an IC Card Reader
162
Installing a Pad Power Connector
164
Installing a Pad
167
Securing the Pad Mounting Kit
168
Installing Monitoring Components on Cable Troughs
171
Installing a Smart ETH Gateway
171
Optional) Installing an ETH Converter
173
Installing Temperature Sensors
174
Rules for Deploying T/H Sensors
175
Installing a T/H Sensor
177
Installing a WLDS900 Water Sensor (Used in Intelligent Micro-Modular)
179
Connecting a Cable to the WLDS900 Water Detector
179
Laying out the Water Detection Cable (Top Pipe Routing)
181
Laying out the Water Detection Cable (Bottom Pipe Routing)
183
Huawei FusionModule2000 V500R003C10 Installation Manual (271 pages)
Smart Modular Data Center 2000 mmHigh Cabinets, Dual-Row Aisle Containment, 208 V
Brand:
Huawei
| Category:
Server
| Size: 23.07 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Installation Preparations
10
Transportation and Placing Precautions
10
Unpacking and Acceptance
11
Installation Environment Requirements
12
Site Requirements
14
Tools and Instruments
16
Tools Delivered with Equipment
20
Personnel Requirements
23
Installation Process
23
2 Scenario Description
25
3 Hardware Installation Preparations
27
Optional) Installing Bases
27
Installing Adjustable Bases
27
Precautions for Installing the Base
27
Installing a Cabinet Base
28
Assembling a Base
28
Positioning Bases
30
Securing Bases
32
Installing Fixed-Size Bases
34
Deploying a 300 MM Wide Air Conditioner Base
34
Deploying Bases for a 600 MM Wide IT Cabinet/Battery Cabinet/Network Cabinet
36
Deploying 600 MM Wide Bases for Pdcs
37
Deploying 800 MM Wide Fixed Bases
39
Securing Bases
39
Preparing for Installing the 21 Kw Netcol5000-A Air Conditioner
42
Optional) Refrigerant R410A
42
Optional) Refrigerant Oil
43
Optional) Oil Trap and Inverted Trap
43
Humidifier Water Inlet Pipe
44
Drainpipe
45
Pipe Support
46
Cable Specifications
47
Engineering Procurement) Water Softener
49
Checking the Air Pressure
49
Removing Pallets
51
Unpacking and Checking
51
Removing the IT Cabinet Pallet
54
Removing the Netcol5000-A 25 Kw Air Conditioner Pallet
55
Optional) Adjusting IT Cabinet Side Plates
56
Optional) Adjusting Battery Cabinet Side Plates
57
Installing a Tail Frame
58
Optional) Installing a 300 MM Wide Air Conditioner Enclosure Frame
63
Installing Air Conditioner Outdoor Units and Routing Pipes
64
4 Installing Cabinets
65
Installing Cabinets (with Bases)
65
Positioning Cabinets (Without Bases)
68
Installing Cabinets (Without Bases)
69
Optional) Installing a 300 MM Wide Air Conditioner Adaptive Frame
75
Installing Cabinet Accessories
78
Optional) Taking out PDU2000 Cables and Industrial Connectors
78
Optional) Installing a Branch Ground Copper Bar
80
Optional) Installing a Vertical Ground Copper Bar
81
Optional) Setting a Mechanical Coded Lock
82
5 Installing the Contained Aisles
86
Installing Skylights
86
Skylight Overview
86
MM Wide Control Skylight
86
MM Wide Control Skylight
87
MM Wide Flat or Rotating Skylight
87
MM Wide Flat or Rotating Skylight
88
MM Wide Flat Skylight
89
Optional) Installing Cable Separation Panels on Control Skylights
90
Securing Skylights
91
Installing a Rotating Skylight Magnetic Lock
93
Installing End Doors
94
Installing a Lower Mounting Kit for the End Door
95
Installing a Sliding Door
97
Installing a Revolving Door
105
Attaching Cabinet Labels
116
Optional) Installing Aisle Lights
118
Optional) Installing Cable Trays
122
Optional) Installing Cable Troughs
125
Installing a 600 MM Wide Cable Trough
125
Installing a 300 MM Wide Cable Trough
129
Installing an 800 MM Wide Cable Trough
131
Installing End Panels for Cable Troughs
131
8 Installing Monitoring Devices
133
Device Layout in the Network Cabinet
133
Optional) Installing a Server
134
Optional) Installing a VCN500
136
Optional) Installing a LAN Switch
137
Installing an ECC800
138
Optional) Installing a Rack Environment Unit
141
Installing Monitoring Components on a Control Skylight
142
Installing a Camera
143
Optional) Installing a Smoke Detector
147
Optional) Installing the Multi-Functional Sensor
147
Optional) Installing Monitoring Components on the End Door
148
Monitoring Component Layout for the Sliding Door
148
Monitoring Component Layout for the Revolving Door
149
Installing an Actuator or Converter
150
Installing an Alarm Beacon
153
Optional) Installing a Revolving Door Magnetic Lock
154
Optional) Installing a Sliding Door Magnetic Lock
158
Installing Buttons
160
Installing the Pad Mounting Kit
161
Installing a Fingerprint and Card Reader
162
Installing a Fingerprint and Card Reader with a Keypad
163
Installing a Card Reader with a Keypad
164
Installing an IC Card Reader
165
Installing a Pad Power Connector
167
Installing a Pad
170
Securing the Pad Mounting Kit
171
Installing a Smart ETH Gateway
174
Installing Temperature Sensors
177
Rules for Deploying T/H Sensors
178
Installing a T/H Sensor
180
Installing a WLDS900 Water Sensor (Used in Intelligent Micro-Modular)
182
Connecting a Cable to the WLDS900 Water Detector
182
Laying out the Water Detection Cable (Top Pipe Routing)
184
Laying out the Water Detection Cable (Bottom Pipe Routing)
186
Optional) Installing Indoor Cable Trays
189
10 Installing Cabinet Sealing Plates
190
Advertisement
Huawei FusionModule2000 V500R003C10 Product Description (217 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Network Hardware
| Size: 10.33 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Positioning
9
2 Features
10
Solution Overview
12
Single-Row 1200 MM Wide Aisle Containment
13
Dual-Row 1200 MM Wide Aisle Containment
14
4 Typical Configurations
16
5 Power Supply and Distribution System
19
System Overview
19
Power Supply and Distribution System for Smart Module a
24
Power Supply and Distribution System for Smart Module B
27
System Hardware
33
Integrated UPS (50 Kva, 125 Kva)
33
Product Structure
33
Power Module
37
Bypass Module
38
Control Module
39
Overview
39
Ecm
39
Dry Contact Card
41
Monitoring Interface Card
42
Mdu
47
Technical Specification
49
Integrated UPS (60 Kva, 125 Kva)
52
Product Structure
52
Power Module
54
Bypass Module
55
Control Module
56
Overview
56
Ecm
57
Dry Contact Card
58
Monitoring Interface Card
60
Mdu
65
Technical Specification
67
Integrated PDF
71
Precision PDF
74
New Main Way 2.0
75
General Input Unit
77
Power Distribution Unit
80
Smart Cooling Product PDB
80
Battery Cabinet
81
Rpdu Introduction
84
Rpdu
84
Optional) Smart Rpdu
85
6 Cabinet Aisle System
87
Cabinets and Accessories
87
Network Cabinet
87
Cabinet
88
Top Sealing Plate
90
Cabinet Bottom Sealing Plate
91
Cabinet Enclosure Plate
92
Cable Management Devices
93
Optional) Adjustable Base
96
Aisle and Mechanical Parts
97
Skylight
97
Aisle End Door
99
Sliding Door
99
Revolving Door
99
Electric Sliding Door
101
M-Shaped Cable Trough
101
Optional) Mesh Cable Trough
102
Optional) Cable Tray
103
Optional) Adaptive Frame
104
Optional) Ground Copper Bar
105
7 Temperature Control System
107
System Overview
107
Netcol5000-A025 Smart Cooling Product
107
Indoor Unit Components
107
Controller
109
Appearance and Ports
109
Function and Features
111
Application Environment
112
Technical Specifications
115
Netcol5000-A035 Smart Cooling Product
117
Indoor Unit
117
Appearance
117
Components
118
Outdoor Unit
119
Controller
120
Physical Ports
123
Technical Specifications
123
Netcol5000-A050 Smart Cooling Product
125
Product Composition
126
Operating Environment Requirements
129
Controller
131
Technical Specifications
133
Netcol500 Outdoor Unit
134
Product Composition
135
Technical Specifications
137
Optional) Low-Temperature Component
139
Optional) Sunshade
141
Water Cooling Module
142
Huawei FusionModule2000 V500R003C10 User Manual (154 pages)
Modular Precision PDC
Brand:
Huawei
| Category:
Server
| Size: 8.54 MB
Table of Contents
About this Document
3
Table of Contents
5
User Manual Usage
8
Safety Precautions
9
General Safety Precautions
9
Electrical Safety
10
Environmental Safety
11
Mechanical Safety
11
Laying out Cables
12
PDC Silk Screen Description
12
PDC Label Description
13
Overview
14
Positioning
14
Appearance
14
Appearance of the Modular Precision PDC with a Single Input
15
Appearance of the Modular Precision PDC with Dual Inputs
16
Features
18
Technical Specifications
19
Modules
20
Configuration Principle
20
Structural Module
23
Power Distribution Module
23
Monitoring Module
25
Components
27
Mdu
27
Monitoring Board Module
30
Mccb
31
Mcb
31
Acceptance Guide
34
Installation Guide
37
Site Requirements
37
Installation Preparations
37
Obtaining Technical Documents
37
Obtaining Tools and Materials
38
Preparing Consumables
40
Checking Personnel Requirements
40
Checking the Installation Environment
41
Installing the PDC
41
Moving the PDC
41
Installing the PDC on a Concrete Floor
44
Installing the PDC on an ESD Floor
48
Installing Cables
50
Cable Routing Rules
50
Power Cable Specifications
53
Preparing Terminals
53
Connecting Cables
56
Commissioning Guide
63
Check before Power-On Commissioning
63
Power-On Commissioning
64
MDU Commissioning Guide
68
UI Appearance
68
Menu Hierarchy
70
Common Functions
70
Historical Alarm
71
Branch Output 1
72
Branch Output 2
74
System Information
75
Running
76
Main Input 1
77
Branch Output 1
80
Input 1 Curve
82
Main Input 2
83
Branch Output 2
85
Input 2 Curve
87
Query Energy Yield
88
Alarms
89
Active Alarm
90
Historical Alarm
91
Buzzer off
92
Settings
94
Communication
96
System Parameters
98
Huawei FusionModule2000 V500R003C10 Maintenance Manual (144 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Storage
| Size: 9.1 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Safety Information
8
General Safety
8
Personnel Requirements
11
Electrical Safety
11
Installation Environment Requirements
13
Mechanical Safety
15
Cooling System Safety
17
Battery Safety
18
Others
21
1000 M Preparations
22
O&M Personnel Skill Requirements
22
Tools
22
Reference Documentation
25
3 Routine Maintenance
27
Overview
27
Routine Maintenance Checklist
28
Monthly Maintenance
30
Quarterly Maintenance
35
Semiannual Maintenance
43
Annual Maintenance
55
4 Alarms and Troubleshooting
57
Alarm Handling Flowchart
58
Viewing and Collecting Alarm Information
58
Determining the Faulty Area and Alarm Severity
59
Locating and Rectifying Faults
59
5 Parts Replacement
61
Commonecc800-Pro Operations
61
Preparations and Webui Login
61
Performing Startup Password Authentication
64
Synchronizing the Configuration Parameters
66
Replacing Power Supply and Distribution System Components
67
Parts Replacement for the Precision PDF
67
Parts Replacement for the Integrated PDC
67
Parts Replacement for the Integrated UPS
68
Parts Replacement for the Smartli
68
Replacing an Rpdu
69
Replacing a Smart Rpdu
69
Parts Replacement for the New Main Way
70
Parts Replacement for the Cooling System
71
Parts Replacement for the Netcol5000 Smart Cooling Product
71
Parts Replacement for the Netcol500 Variable Speed Outdoor Unit
72
Parts Replacement for the Management System
72
Parts Replacement for the ECC800-Pro
72
Replacing an ECC800-Pro Main Control Module
73
Replacing an ECC800-Pro PSU
74
Replacing ECC800-Pro Antennas
75
Replacing a SIM Card and Micro SD Card
75
Replacing the Management System
77
Replacing a VCN510
77
Replacing the VCN510 Hard Disk
78
Replacing a VCN520
83
Replacing a VCN540
84
Replacing the VCN520/VCN540 Hard Disk
85
Replacing an IVS1800
87
Replacing a Hard Disk for the IVS1800
88
Replacing a Camera
91
Parts Replacement for the Access System
92
Replacing an Access Actuator
92
Replacing an Access Control Device
93
Replacing a Button
94
Replacing a Sliding Door Magnetic Lock
95
Replacing a Double-Door Magnetic Lock
97
Replacing a Door Status Sensor
102
Replacing a Cabinet Electronic Lock
103
Parts Replacement for the Intelligent Battery Monitoring System
104
Replacing an Ibox
104
Replacing an Ibat
106
Replacing a Smart ETH Gateway
107
Replacing the Wifi Module
108
Replacing a Multi-Functional Sensor
109
Replacing a Smoke Detector
110
Replacing a Cabinet Temperature Sensor
111
Replacing a Temperature and Humidity Sensor
112
Replacing a T/H Sensor (33010516)
115
Replacing a Water Sensor
118
Replacing an Alarm Beacon
120
Replacing a UIM20A Expansion Module
121
Replacing a Fusionmodule Actuator
122
Replacing the Fuse for a Fusionmodule Actuator
123
Replacing a Skylight Magnetic Lock
124
Replacing a Pad
125
Replacing a PAD Power Connector
126
Replacing an Aisle LED Light
130
Replacing the Strip Light of an Atmosphere Light
132
Replacing an Atmosphere Light Power Supply
132
Replacing an Elight Strip Light
134
Replacing an Elight Actuator
135
Replacing an Elight Power Supply
136
Replacing a Smart U Space Manager (Connected to a UIM20A Expansion Module)
137
Common Maintenance Tasks
140
Operating a Hydraulic Circuit Breaker (Inside the Smart Rpdu)
140
Handling Long-Time Hotspot at the Air Inlet of a Cabinet in Icooling Mode
141
Huawei FusionModule2000 V500R003C10 Product Description (147 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Storage
| Size: 5.67 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Overview
8
Product Model
8
Positioning
8
Features
8
2 Typical Configurations
11
Typical Application Scenarios
11
Single-Row 1200 MM Wide Aisle Containment
12
Dual-Row 1200 MM Wide Aisle Containment
13
3 System Architecture
15
Components of the Single-Row 1200 MM Wide Aisle Containment
15
Components of the Dual-Row 1200 MM Wide Aisle Containment
16
Cabinet
17
Network Cabinet
19
Skylight
20
End Doors for Aisles
23
Cable Trough
24
Optional) Cable Tray
25
Optional) Adaptive Frame
26
Optional) Base
27
Scenario with Columns
28
Power Supply and Distribution System
31
Power Supply and Distribution System of Smart Module a
32
Power Supply and Distribution System of Smart Module B
34
Integrated UPS Cabinet
37
Integrated PDC
41
Precision PDC
42
Battery Cabinet
47
Pdu2000
50
Intelligent Battery Monitoring System
51
CIM
52
Bim
62
Cooling System
64
System Description
65
L1/L2 Linkage (Icooling Function)
65
Netcol5000-A 25 Kw
66
Composition
66
Indoor Unit Components
66
Application Environment
68
Technical Specifications
71
Netcol5000-A 35 Kw
72
Components
72
Indoor Unit
72
Physical Ports
75
Operating Environment Specifications
76
Technical Specifications
78
Appearance and Composition of the Netcol500 Outdoor Unit
79
Technical Specifications of the Netcol500 Outdoor Unit
81
Optional) Dehumidifier
83
Optional Components
86
Low-Temperature Component
86
Sunshade
87
Controller
88
Management System
89
System Description
90
Server
91
Ecc800
92
LAN Switch
102
Video System
103
IP Camera
103
Vcn500
104
Skylight Control System
105
Skylight Actuator
105
Access Control System
108
Access Actuator
108
Aisle Access Control
112
Cabinet Access Control
116
Water Sensor
117
Optional) Smoke Detector
118
Optional) Temperature Sensor
119
Multi-Functional Sensor
120
Rack Environment Unit
122
Smart ETH Gateway
124
Wifi Converter
126
Alarm Beacon
128
ETH Converter
129
Pad
131
Cable Management System
132
Lighting System
134
AC Actuator
134
Aisle Light
137
Surge Protection and Grounding System
138
Surge Protection Solution
138
Grounding Solution
138
Integrated Cabling System
140
Cable Trough
140
Cables
142
Huawei FusionModule2000 V500R003C10 Maintenance Manual (140 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Data Loggers
| Size: 6.68 MB
Table of Contents
About this Document
3
Table of Contents
5
Safety Information
8
Personal Safety
9
Electrical Safety
10
Environmental Requirements
12
Mechanical Safety
14
UPS Safety
18
Cooling System Safety
19
Battery Safety
20
M Preparations
26
O&M Personnel Skill Requirements
26
Tools
27
Reference Documentation
29
Routine Maintenance
31
Overview
31
Routine Maintenance
32
Monthly Maintenance
34
Quarterly Maintenance
39
Semiannual Maintenance
48
Annual Maintenance
59
Alarms and Troubleshooting
61
Alarm Handling Flowchart
62
Viewing and Collecting Alarm Information
62
Determining the Faulty Area and Alarm Severity
63
Locating and Rectifying Faults
63
Parts Replacement
65
Commonecc800-Pro Operations
65
Preparations and Webui Login
65
Synchronizing the Configuration Parameters
69
Replacing Power Supply and Distribution System Components
69
Parts Replacement for the Precision PDF
69
Parts Replacement for the Integrated PDF
69
Parts Replacement for the Integrated UPS
70
Replacing an Rpdu
70
Replacing a Smart Rpdu
71
Parts Replacement for Smart Busbars
72
Parts Replacement for the Cooling System
73
Parts Replacement for Smart Cooling Products
73
Parts Replacement for the Management System
74
Parts Replacement for the ECC800-Pro
74
Replacing an ECC800-Pro Main Control Module
74
Replacing an ECC800-Pro PSU
76
Replacing ECC800-Pro Antennas
76
Replacing a SIM Card and Micro SD Card
77
Replacing the Management System
78
Replacing an IVS1800
78
Replacing a Hard Disk for the IVS1800
80
Replacing a Camera
82
Parts Replacement for the Access System
83
Replacing an Access Actuator
83
Replacing an Access Control Device
84
Replacing a Button
85
Replacing a Sliding Door Magnetic Lock
86
Replacing a Double-Door Magnetic Lock
88
Replacing a Door Status Sensor
93
Replacing a Cabinet Electronic Lock
94
Replacing a Cabinet Fingerprint and Card Lock
95
Replacing an Automatic Door Status Sensor
96
Replacing a Smart ETH Gateway
97
Replacing the Wifi Module
98
Huawei FusionModule2000 V500R003C10 Maintenance Manual (131 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Server
| Size: 6.17 MB
Table of Contents
About this Document
3
Table of Contents
5
1 Safety Information
8
General Safety
8
Personnel Requirements
11
Electrical Safety
11
Installation Environment Requirements
13
Mechanical Safety
14
Cooling System Safety
17
Battery Safety
18
Others
20
1000 M Preparations
21
O&M Personnel Skill Requirements
21
Tools
21
Reference Documentation
24
3 Routine Maintenance
26
Overview
26
Routine Maintenance Checklist
26
Monthly Maintenance
27
Quarterly Maintenance
31
Semiannual Maintenance
37
Annual Maintenance
44
4 Alarms and Troubleshooting
46
Alarm Handling Flowchart
47
Viewing and Collecting Alarm Information
47
Determining the Faulty Area and Alarm Severity
48
Locating and Rectifying Faults
49
5 Parts Replacement
51
Common ECC800 Operations
51
Preparations and Webui Login
51
Synchronizing the Configuration Parameters
55
Replacing Power Supply and Distribution System Components
55
Parts Replacement for the Precision PDC
55
Parts Replacement for the Integrated PDC
56
Parts Replacement for the Integrated UPS
56
Replacing an Rpdu
57
Replacing a Smart Rpdu
57
Parts Replacement for the New Main Way
58
Parts Replacement for the Cooling System
59
Parts Replacement for the Netcol5000-A025 Smart Cooling Product
59
Parts Replacement for the Netcol5000-A042 Smart Cooling Product
59
Parts Replacement for the Netcol5000-A050 Smart Cooling Product
60
Parts Replacement for the Netcol500 Variable Speed Outdoor Unit
61
Parts Replacement for the Management System
61
Parts Replacement for the ECC800-Pro
62
Replacing an ECC800 Main Control Module
62
Replacing an ECC800 PSU
64
Replacing ECC800 Antennas
64
Replacing a SIM Card and Micro SD Card
65
Parts Replacement for the Video Surveillance System
67
Replacing a VCN510
67
Replacing the VCN510 Hard Disk
68
Replacing a VCN520
73
Replacing a VCN540
75
Replacing the VCN520/VCN540 Hard Disk
76
Replacing a Camera
78
Parts Replacement for the Access System
79
Replacing an Access Actuator
79
Replacing an Access Control Device
80
Replacing a Button
81
Replacing a Sliding Door Magnetic Lock
82
Replacing a Double-Door Magnetic Lock
84
Replacing a Door Status Sensor
89
Replacing a Cabinet Electronic Lock
90
Parts Replacement for the Intelligent Battery Monitoring System
91
Replacing an Ibox
91
Replacing an Ibat
93
Replacing a Smart ETH Gateway
94
Replacing the Wifi Module
95
Replacing a Multi-Functional Sensor
96
Replacing a Smoke Detector
97
Replacing Cabinet Temperature Sensors
98
Replacing a Temperature and Humidity Sensor
99
Replacing a Temperature and Humidity Sensor (33010516)
102
Replacing a Water Sensor
105
Replacing an Alarm Beacon
107
Replacing a Rack Environment Unit
108
Replacing an AC Actuator
109
Replacing a Skylight Actuator
111
Replacing a Skylight Magnetic Lock
112
Replacing a Pad
113
Replacing a Pad Power Connector
113
Replacing an Aisle LED Light
118
Replacing the Strip Light of an Atmosphere Light
120
Replacing the Power Supply of an Atmosphere Light
121
Replacing an Elight Strip Light
122
Replacing an Elight Actuator
124
Replacing an Elight Power Supply
125
Replacing a Smart U Space Manager
126
Common Maintenance Tasks
127
Operating a Hydraulic Circuit Breaker (Inside the Smart Rpdu)
127
Handling Long-Time Hotspot at the Air Inlet of a Cabinet in Icooling Mode
128
Huawei FusionModule2000 V500R003C10 Maintenance Manual (121 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Server
| Size: 6.22 MB
Table of Contents
About this Document
3
Table of Contents
5
M Precautions
9
Safety Information
10
General Safety
10
Personnel Requirements
13
Electrical Safety
13
Installation Environment Requirements
15
Mechanical Safety
16
Cooling System Safety
19
Battery Safety
20
Others
22
M Preparations
23
O&M Personnel Skill Requirements
23
Tools
23
Documentation Preparations
25
Routine Maintenance
27
Overview
27
Routine Maintenance Checklist
27
Monthly Maintenance
28
Quarterly Maintenance
31
Semiannual Maintenance
37
Annual Maintenance
45
Alarms and Troubleshooting
47
Alarm Handling Flowchart
47
Viewing and Collecting Alarm Information
48
Determining the Faulty Area and Alarm Severity
48
Locating and Rectifying Faults
49
Parts Replacement
51
Commonecc800-Pro Operations
51
Preparations and Webui Login
51
Synchronizing the Configuration Parameters
55
Replacing Power Supply and Distribution System Components
56
Parts Replacement for the Precision PDC
56
Parts Replacement for the Integrated PDC
56
Parts Replacement for the Integrated UPS
57
Replacing an Rpdu
57
Replacing a Smart Rpdu
58
Parts Replacement for the New Main Way
58
Replacing the General Input Unit
59
Replacing the Power Distribution Unit
63
Replacing the Busbar Trunking Unit
66
Parts Replacement for the Cooling System
69
Parts Replacement for the Netcol5000-A025 Smart Cooling Product
69
Parts Replacement for the Netcol5000-A042 Smart Cooling Product
69
Parts Replacement for the Netcol500 Variable Speed Outdoor Unit
70
Parts Replacement for the Management System
71
Parts Replacement for the ECC800
71
Parts Replacement for the Video Surveillance System
72
Replacing a VCN540
72
Replacing the VCN540 Hard Drive
73
Replacing a Camera
75
Parts Replacement for the Access System
76
Replacing an Access Actuator
76
Replacing an Access Control Device
77
Replacing a Button
78
Replacing a Sliding Door Magnetic Lock
80
Replacing a Double-Door Magnetic Lock
81
Huawei FusionModule2000 V500R003C10 Maintenance Manual (94 pages)
Smart Modular Data Center
Brand:
Huawei
| Category:
Storage
| Size: 4.62 MB
Table of Contents
About this Document
3
Intended Audience
3
Table of Contents
5
1000 M Precautions
7
Cooling System
8
2 Safety Precautions
9
General Safety Precautions
9
Electrical Safety
10
Power Cable
11
Electrostatic Discharge
11
Battery Safety
12
Mechanical Safety
14
Others
15
1000 M Preparations
16
O&M Personnel Skill Requirements
16
Tools
16
Documentation Preparations
19
4 Routine Maintenance
21
Overview
21
Routine Maintenance Checklist
21
Monthly Maintenance
22
Quarterly Maintenance
25
Semiannual Maintenance
29
Annual Maintenance
34
5 Alarms and Troubleshooting
36
Alarm Handling Flowchart
36
Viewing and Collecting Alarm Information
37
Determining the Faulty Area and Alarm Severity
37
Locating and Rectifying Faults
38
6 Parts Replacement
40
Common ECC800 Operations
40
Preparations and Webui Login
40
Synchronizing the Configuration Parameters
44
Replacing Power Supply and Distribution System Components
44
Parts Replacement for the Precision PDC
44
Parts Replacement for the Integrated PDC
45
Parts Replacement for the Integrated UPS
45
Replacing an Rpdu
45
Parts Replacement for the New Main Way
46
Replacing the General Input Unit
46
Replacing the Power Distribution Unit
50
Replacing the Busbar Trunking Unit
52
Parts Replacement for the Cooling System
55
Parts Replacement for the Netcol5000-A025 Smart Cooling Product
55
Parts Replacement for the Netcol5000-A042 Smart Cooling Product
55
Parts Replacement for the Management System
56
Parts Replacement for the ECC800
57
Parts Replacement for the Video Surveillance System
57
Replacing the VCN500 Hard Drive
57
Replacing a VCN500 Gold Power Supply Module
59
Replacing a Camera
60
Parts Replacement for the Access System
61
Replacing an Access Actuator
61
Replacing an Access Control Device
62
Replacing a Button
63
Replacing a Sliding Door Magnetic Lock
64
Replacing a Double-Door Magnetic Lock
66
Replacing a Door Status Sensor
71
Replacing a Cabinet Electronic Lock
72
Parts Replacement for the Intelligent Battery Monitoring System
73
Replacing a Ibox (CIM)
73
Replacing a Ibat (BIM)
75
Replacing a Smart ETH Gateway
76
Replacing a Wifi Converter
77
Replacing a Multi-Functional Sensor
78
Replacing a Smoke Detector
79
Replacing a Cabinet Temperature Sensor
79
Replacing a Water Sensor
80
Replacing an Alarm Beacon
82
Replacing a Rack Environment Unit
83
Replacing an AC Actuator
84
Replacing a Skylight Actuator
85
Replacing a Skylight Magnetic Lock
86
Replacing a Pad
87
Replacing a Pad Power Connector
87
Replacing an Aisle LED Light
93
Advertisement
Related Products
Huawei FusionModule800
Huawei FusionModule5000
Huawei FusionModule500
Huawei FusionModule1000A40 ICT Solution
Huawei FusionModule2000 V500R002C03
Huawei FusionModule1000A20
Huawei FusionModule1000B V100R003C00
Huawei FusionModule1000A
Huawei FusionModule2000-S
Huawei FusionModule500-SU61A12S
Huawei Categories
Cell Phone
Network Router
Wireless Router
Modem
Network Hardware
More Huawei Manuals
Login
Sign In
OR
Sign in with Facebook
Sign in with Google
Upload manual
Upload from disk
Upload from URL