hit counter script

Installation And Service Space - Canon imageRUNNER ADVANCE C5500 Series Customer Expectation Document

Hide thumbs Also See for imageRUNNER ADVANCE C5500 Series:
Table of Contents

Advertisement

imageRUNNER ADVANCE C5500 and C5500 II Series Customer Expectations Document

3.3 Installation and Service Space

The installation site must provide enough space for unrestricted operation,
maintenance work, and proper ventilation. The machine dimensions are in
diagrams on the following pages. Every attempt should be made to install the
equipment in a room that allows for the proper servicing and maintenance of the
equipment, and ensures that issues, such as ventilation, odors, and dust
accumulation are not a concern.
IMPORTANT
• Keep the back of the machine at least 4" (100 mm) away from a wall, and make
sure that approximately 19 3/4
and right sides of the machine for the proper servicing of the equipment.
• The floor must be level (with no bows) and flat for the stabilization and support of
the machine.
• The minimum doorway opening that the machine passes through prior to
installation must be at least 31" wide.
Version 6
imageRUNNER ADVANCE C5500 and C5500 II Series Customer Expectations Document
(500 mm) of space is left around the front, left,
"
Page 28

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents