Installing the Switch Chassis
Step 1
Install two front-mount brackets to the switch as follows:
a) Determine which end of the chassis is to be located in the cold aisle as follows:
• If the switch has port-side intake modules (fan modules with burgundy coloring), position the switch so that its
ports will be in the cold aisle.
• If the switch has port-side exhaust modules (fan modules with blue coloring), position the switch so that its fan
and power supply modules will be in the cold aisle.
b) Position a front-mount bracket so that four of its screw holes are aligned to the screw holes on the side of the chassis.
Note
You can align any four of the holes in the front rack-mount bracket to four of the six screw holes on the
side of the chassis (see the two ways to mount these brackets on a typical chassis, in following figure). The
holes that you use depend on the requirements of your rack and the amount of clearance required for interface
cables (3 inches [7.6 mm] minimum) and module handles (1 inch [2.5 mm] minimum).
1
Front rack-mount bracket aligned to the port end of
the chassis
2
Four M4 screws used to attach the bracket to the
chassis
3
Rear rack-mount guide aligned to the module end of
the chassis
Installing the Switch Using the N3K-C3064-ACC-KIT Rack-Mount Kit
5
Front rack-mount bracket aligned to the module end
of the chassis
6
Four M4 screws used to attach the bracket to the
chassis
7
Two M4 screws used to attach the bracket to the
chassis
Cisco Nexus 93108TC-FX ACI Mode Hardware Installation Guide
21