Main unit
1
Button attachment
1. Attach the SS button 1, operation button 2, and thread cut button 3 to
operation panel A.
2. Attach the switch PCB assembly 4 with the 3 screws 1.
1
2
Touch panel attachment
1. Attach the touch panel (EMU601A2B040) 1 to operation panel A.
*Key point
• Attach the touch panel so that the face with the flat cable
connected is on the front side.
Start movie clip (CD-ROM version only)
Operation panel
Taptite, Bind B
M3X8
0.39 – 0.79 N-m
Color; Gold
Torque
2
3
1
4
1
1
3 - 3