hit counter script

Installing A Fabric Module - Cisco Nexus 9516 Hardware Installation Manual

Aci-mode switch
Hide thumbs Also See for Nexus 9516:
Table of Contents

Advertisement

Installing a Fabric Module

Installing a Fabric Module
Before you begin
• Wear an electrostatic discharge (ESD) wrist strap or other ESD protective device while handling modules.
• Prepare an antistatic surface or packing materials for each module that you remove from the chassis.
• Be sure that you are replacing a fabric module with the same type of fabric module. All the fabric modules
Step 1
Place one hand on the front of the module and turn the module 90 degrees so that the electrical connectors are on the
bottom.
Step 2
Unscrew the two captive screws (one on each ejector handle) and rotate the ejector handles away from the chassis. See
Callouts 1 and 2 in the following figure. Be sure that the locking posts on the top and bottom of the chassis rotate into
the module so that the module can slide fully into the slot. See Callout 3 of the following figure.
Cisco Nexus 9516 ACI-Mode Switch Hardware Installation Guide
62
that are installed in the switch must be the same type.
Replacing or Installing Modules, Fan Trays, and Power Supplies

Advertisement

Table of Contents
loading

This manual is also suitable for:

Nexus 9000 seriesC9516-fm-e-e2

Table of Contents