hit counter script

Installing The Dc Power Supply In The Switch - Cisco Catalyst 9300X Hardware Installation Manual

Table of Contents

Advertisement

Installing the DC Power Supply in the Switch

Figure 54: Attaching the Ground Lug and Wire Assembly
1
Step 6
Using a ratcheting torque screwdriver, torque the ground-lug screws to 22-30 lbf-in.
Step 7
Connect the other end of the grounding wire to an appropriate grounding point at your site or to the rack.
Installing the DC Power Supply in the Switch
Before you begin
Before installing the power supply, see the
Cisco Catalyst 9300 Series Switches Hardware Installation Guide
92
Attaching the single-hole ground lug
2
Attaching the dual-hole ground lug
Installation Guidelines, on page
Installing a Power Supply
86.

Hide quick links:

Advertisement

Table of Contents
loading

Table of Contents