B-5) Perform step A-8).
B-6) Reassemble the parts from step B-4) in reverse order.
B-7) Make test copies on paper from the left deck, and check that no jam etc. occur.
C) Procedure for adjusting the pressure of the separation roller in the cassette 3/cassette 4 pickup unit
C-1) Remove the 2 hinge pins of the right lower cover, and remove the right lower cover unit.
C-2) Remove the cassette 3 and the cassette 4. The following describes how to remove the cassette 3
pickup unit.
C-3) Remove 1 screw to remove the connector cover.
C-4) Disconnect 1 connector and remove 1 screw [1], and remove the pickup unit [2].
C-5) Perform step A-8).
C-6) Reassemble the parts from step C-4) in reverse order.
C-7) Make test copies on paper from the cassette 3/cassette 4, and check that no jam etc. occur.
pg. 15